140 - 148 Borough High Street London Southwark SE1
Variation of Condition 1 'Approved Plans' of planning permission ref. no. 21/AP/1825: Construction of a single storey roof extension and ground to fourth floor rear extensions to provide additional office space (Use Class E) incorporating external terraces, recladding of front elevation, creation of plant enclosure at roof level and other associated works. Variation sought: Tree removal - a new proposed layout drawing along with an Arboricultural Report has been submitted.
The Old Sports Centre West Town Road Bristol BS11 9FQ
Application to approve details in relation to condition 4 (approved remediation scheme) and 12 (tree planting plan) of permission 21/00204/X Application for variation of condition 10 (M5 Motorway bridge) of permission 18/03064/F Proposed containerised self-storage facility with ancillary office .
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Site Of Former 90 Asheridge Road Chesham Buckinghamshire
Approval of conditions 1 (Construction Environment Management Plan), 2(Tree Protection Plan), 3(Site Operatives Parking), 5(Travel Plan Framework), 6(Biodiversity Scheme) and 31(Piling) of planning permission PL/22/0864/VRC - Variation of conditions 2 (Materials), 3 (Floor levels), 4 (Additional floor space), 5 (Fencing), 6 (Parking), 7 (Site operatives and visitors), 8 (Landscaping) and 9 (Noise) of planning permission CH/2008/0629/FA (Redevelopment of site to provide detached building comprising technical services centre, offices, internal plant and I.T facilities, together with detached substation, external plant enclosures, parking, fence surround, closure of three accesses and alterations to one access.)
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Tesco Stores, 275 Kennington Lane And 145-149 Vauxhall Street London SE11
Application for a non-material amendment following a grant of planning permission ref: 20/02203/VOC (Variation of Conditions 2 (Approved Plans) and 70 (Quantum of Development) of planning permission 18/02597/EIAFUL (Demolition of existing building and redevelopment of the site to provide a mixed-use development comprising the erection of 3 new buildings (Plot A,B,C) ranging from 4-17 storeys to provide residential (Class C3), a replacement Tesco store (Class A1), office (Class B1) and flexible commercial floorspace (Classes A1, A2, A3 or B1)) granted on 21.12.2018 as amended by 19/03649/NMC and 20/00786/NMC) granted on 30.03.2021. Amendment sought: Vary Condition 2 (Approved Drawings), namely for: alterations to glazed brickwork and window reveals on Block G, Removal of 17th-storey canopy on Block A, alteration to tree positions along Kennington Lane. Revised wording to Condition 16 (Obscured Glazing) to refer only to windows along Kennington Lane. Revised wording to Conditions 47 & 48 (Compliance with Energy Strategy Non-Residential and Residential respectively) from "Prior to Occupation" to "Within Three Months of Final Occupation trigger. Revised wording to Condition 70 (Commercial Floorspace) to facilitate a reduction in commercial space and increase in refuse storage of Block A, along Vauxhall Street. Written confirmation on when the Phase 2 Highway Works will be completed (S106 obligation).
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
8 Rose And Crown Yard London SW1Y 6RE
Variation of condition 8 of planning permission dated 19 October 1995 (RN: PE/TP/4414/S/BW) for the: Demolition and redevelopment of 44-47 Pall Mall, 21 Cleveland Place and 8-9 Rose and Crown Yard to provide a basement, ground and part 7 part 5 upper storey office building fronting Pall Mall and a basement, ground and four upper storey block of 7 self-contained flats with parking in Rose and Crown Yard, use of 10/11 Rose and Crown Yard as offices, namely to allow the unrestricted use of the seven ground floor garages at 8-9 Rose and Crown Yard.