Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Portland House Bressenden Place London SW1E 5BH
Two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment.
Glebe Farm Helpringham Road Burton Pedwardine Sleaford Lincolnshire NG34 0BX
Application to discharge conditions 2 (materials), 3 (windows and doors-dwelling), 4 (windows and doors - garden room), 6 (contamination) and 7 (tree protection) to planning permission 22/0518/FUL -and conditions 2 (materials), 3 (windows and doors-dwelling) and 4 (windows and doors - garden room) to listed building consent 220533/LBC - Conversion of barn to dwelling and conversion of garage to garden room/office along with construction of vehicular access (Amended description)
Howards Farm Stockers Lane Kingfield Woking Surrey GU22 9DB
Approval of details pursuant to conditions 03 (External materials), 05 (Landscape details) and 06 (Tree protection details) of planning permission ref: PLAN/2020/1098 dated 20.04.2021 (Section 73 application to vary Conditions 2 and 5 of planning permission PLAN/2018/0823 (Proposed single storey detached outbuilding to form office, gym and playroom) to allow changes to the fenestration).
Durham School Quarryheads Lane Durham DH1 4SZ
Use of current school admin building as a multi-use sports pavilion, entertainment suite and office space including fenestration changes, canopy, balcony, ramped access, footpath and works to protected trees including felling works (trees protected by virtue of their position within the conservation area).
150-154 Borough High Street London Southwark SE1
RESUB- Detail of Condition 3-Tree survey - proposed works/protection as required by full planning permission ref 19/AP/1173 dated 21/03/2022 for minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant. Condition 3 Arboriculture 22/AP/1008 Oliver Stutter The condition is being re-submitted purely so that it can be discharged under the new S73 reference 21/AP/0960
Scott House Hagsdell Road Hertford Hertfordshire SG13 8WA
Change of use of Scott House from office use (E) to dwelling houses (C3) to create 15 apartments, including part demolition at ground floor side and rear and erection of two and a half storey side and rear extensions and alterations to fenestration. Provision of car parking and associated works. No change to adjacent Stables building. (Approved Plans) of planning permission 3/20/1953/FUL of Condition Number(s): Condition 2 (approved Drawings) and Condition 25 (Existing trees).
Low Snape Farm Walton Head Lane Kirkby Overblow North Yorkshire HG3 1HZ
Approval of details under condition 3 (Root Protection Area) and condition 5 (Tree Root Retention) of planning permission 21/01884/FUL: Erection of energy building with swimming pool, gym and store and solar PV panels, erection of glazed link extension, conversion of stables and outbuildings to form gallery, store, office, and annex including erection of single storey extensions, installation of windows, doors, rooflight and gates and associated groundworks and landscaping.
Land to The rear of 4-8 Millbrook Road East Southampton
Application for approval of details reserved by condition 2(Materials), 3(Windows), 13(Tree protection), 14(Tree Retention), 16(Overhanging tree loss), 17(Arboricultural Method Statement), 20(Construction Management Plan), 24(Land Contamination), 27(Noise & Vibration) and 31(Public Sewer protection) of permission 18/00815/FUL for erection of a 6-storey building to provide 12 flats (4 x 1-bedroom, 8 x 2-bedroom) and one floor of office accommodation