Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works
Land Off Mottram Old Road, Hyde, SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of farm/agricultural buildings and stables, and associated works
Park Farm Belsteads Farm Lane Chelmsford Garden Community Chelmsford CM3 3PX
Details pursuant to Condition 11 (Construction Environmental Management Plan) of planning permission ESS/99/22/CHL. ESS/99/22/CHL was for Temporary compound associated with the operation of the Park Farm mineral extraction area at Bulls Lodge Quarry comprising the parking of contractors plant and machinery, a mobile welfare unit, operatives caravan accommodation, associated car parking and ancillary development and landscaping.
Land At Swaineshill Pickaxe Lane South Warnborough Hook Hampshire
Construction of 1 no. dwelling with ancillary accommodation with access, parking and landscaping (following demolition of 4 no. agricultural buildings)
Land At Swaineshill Pickaxe Lane South Warnborough Hook Hampshire
Construction of 2 no. dwellings with ancillary accommodation with access, parking and landscaping (following demolition of 4 no. agricultural buildings)
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Swinfen Hall Hotel The Drive Lichfield Staffordshire WS14 9RE
Various renovation works including the conversion of staff accommodation and outdoor bothies to create 9 new hotel rooms, 2 holiday cottages and the construction of 12 No. lakeside chalets, demolition of agricultural structures, erection of 1 No. two storey hotel block comprising 12 hotel rooms, 1 No. two storey hotel block comprising 7 hotel rooms, and a hotel leisure complex comprising spa with treatment rooms, gym, indoor/outdoor pool facilities and restaurant, extension of car park, erection of an entrance gate and all associated works and landscaping across the site.