Stable Block Borde Hill Garden Borde Hill Lane Haywards Heath West Sussex RH16 1XP
Extension and alterations to the existing Stables building to improve and expand the existing restaurant and café/tea house. Partial change of use of Stables from gym to new farm shop/ delicatessen with storage above. Change of use first floor from offices to 4 No. hotel rooms for visitor accommodation and associated parking and landscaping works (Amended plans, Design and Access Addendum, Bat Emergence Survey and Biodiversity Net Gain information received 20 June 2023)
Barn Off Wandale Lane Great Barugh Malton North Yorkshire
Change of use of agricultural barn to form 1no. one bedroom dwelling for holiday accommodation, the erection of a single storey side extension with timber cladding and associated parking and landscaping
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Oak Farm Tofts Lane Sheffield S6 5SL
Use of existing properties (Oak Farm and Oak House) as assisted living (Use Class C2) with ancillary facilities including storage, parking and landscaping (retrospective) and erection of side extension to Oak House to provide additional living accommodation
West House Farm Cottage Shilvington Newcastle Upon Tyne Northumberland NE20 0AR
The erection of 3no. cyclist accommodation units, associated extension to West House Farm Cottage, installation of solar panels, and associated landscaping and infrastructure
Monks Cottage Eastleach Cirencester Gloucestershire GL7 3NQ
Change of land use from agricultural to residential; erection of 2no. detached buildings and engineering works to provide an indoor/outdoor pool house and sauna; conversion, extension and alteration of 4no. existing detached barns to provide ancillary accommodation, yoga studio, music studio and home gym; erection of garage extension to form a carport and associated demolition, access and landscaping works (part retrospective)
Manor Farm The Green To Manor Farm North Deighton North Yorkshire LS22 4EN
Approval of details required under condition: 4 (Land contamination remediation), 8 (EV charging points), 11 (Foul water drainage), 12 (Landscaping scheme), 19 (Materials) and 20 (Joinery details) under planning consent 22/03678/FUL - Conversion of agricultural barn to from 1 no. dwelling including erection of a single storey extensions, roof and fenestration alterations, and demolition of agricultural barns; conversion of agricultural building to form garage, workshop and ancillary residential accommodation.
Land At Village Street Ganthorpe Malton
Change of use, alteration, partial rebuilding and extension of agricultural buildings to form 1no. five bedroom dwelling (Barn 1) to include excavation and formation of a lower ground floor level forming the main accommodation area and external courtyard area together with substantial rebuilding of a detached adjacent agricultural building (Barn 2) to form a plant/storage room and garaging and associated landscaping
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.