Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works, namely to amend the wording of Condition 6 to allow for revised CIL phasing.
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (ref. 20/03307/FULL) for 'Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works' namely to amend the current wording of condition 34 which relates to the contaminated land site investigation.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the current wording of conditions 45 and 47 of planning permission to allow a phased discharge of conditions.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN: 20/03307/FULL) for the: Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. NAMELY, to allow amendments to Building C, comprising the separation of the basements of Building A and C, reduction in floor to floor heights, enlargement of cores, revised housing mix and associated internal alterations, addition of fixed guarding and amendments to the Ebury Street facade; and associated alterations.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the wording of Condition 4 to exclude demolition works from the conditon.
Pine End Works & Land To The North Harbour Road Lydney Gloucestershire GL15 4ER
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
140 Wales Farm Road Acton W3 6UG
Details of Interim BREEAM Assessment and related Certification part pursuant to condition 27 (part discharge - condition 27 part 1a & 1b - Student Accommodation only) of planning permission ref: 172682FUL Dated 16/04/2018 for: Demolition of all existing buildings and the redevelopment of the site to provide five buildings of 5, 7, 10, 11 and 31 storeys comprising 736 student bed spaces (603 rooms), 85 residential flats, 6214sqm (GIA) of Office (B1) floor space with associated access from Wales Farm Road, amenity space, cycle parking, four disabled car parking spaces, servicing, public realm improvements and landscaping (Full Planning Application accompanied by an Environmental Impact Assessment).
Pine End Works Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)