Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works, namely to amend the wording of Condition 6 to allow for revised CIL phasing.
Stable Block Borde Hill Garden Borde Hill Lane Haywards Heath West Sussex RH16 1XP
Extension and alterations to the existing Stables building to improve and expand the existing restaurant and café/tea house. Partial change of use of Stables from gym to new farm shop/ delicatessen with storage above. Change of use first floor from offices to 4 No. hotel rooms for visitor accommodation and associated parking and landscaping works (Amended plans, Design and Access Addendum, Bat Emergence Survey and Biodiversity Net Gain information received 20 June 2023)
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (ref. 20/03307/FULL) for 'Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works' namely to amend the current wording of condition 34 which relates to the contaminated land site investigation.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the current wording of conditions 45 and 47 of planning permission to allow a phased discharge of conditions.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN: 20/03307/FULL) for the: Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. NAMELY, to allow amendments to Building C, comprising the separation of the basements of Building A and C, reduction in floor to floor heights, enlargement of cores, revised housing mix and associated internal alterations, addition of fixed guarding and amendments to the Ebury Street facade; and associated alterations.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the wording of Condition 4 to exclude demolition works from the conditon.
Land At And Adjacent To Hulton Park Bolton
PART A: FULL PLANNING APPLICATION FOR RESTORATION WORKS TO HULTON PARK AND EXISTING STRUCTURES & HERITAGE ASSETS WITHIN IT, INCLUDING THE PLEASURE GROUNDS, DOVECOTE, WALLED GARDEN AND LAKES, THE DEMOLITION OF VARIOUSE EXISTING BUILDINGS AND STRUCTURES; THE DEVELOPMENT OF A GOLF RESORT, INCLUDING AN 18-HOLE CHAMPIONSHIP-GRADE GOLF COURSE, CLUBHOUSE, GOLF ACADEMY (COMPROSING DRIVING RANGE, PRACTICE COURSE, ADVENTURE COURSE & ACADEMY BUILDING WITH SPORTS & LEARNING FACILITIES, A GOLF SHOP & CAFE); A HOTEL WITH ADJOINING SPA & CONFERENCE FACILITY, AND OTHER ANCILLARY BUILDINGS, STRUCTURES & ENGINEERING & LANDSCAPE WORKS INCLUDING A MAINTENANCE BUILDING, HIGHWAY ACCESSES, INTERNAL ACCESS ROADS, HIGHWAY UNDERPASS, VARIOUS BRIDGES, BOUNDARY TREATMENTS, EXTERNAL LIGHTING, PARKING, NEW AND REPLACEMENT AND OPEN SPACE; HIGHWAYS INFRASTRUCTURE; AND, WERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF PUBLIC RIGHTS OF WAY NETWORK AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS. PART B: OUTLINE PLANNING APPLICATION FOR THE RESIDENTIAL DEVELOPMENT OF UP TO 1,036 DWELLINGS, A LOCAL CENTRE; VILLAGE HALL; COMMUNITY ALLOTMENTS; PRIMARY SCHOOL; SHOT STAY HOLIDAY ACCONNODATION, COMPRISING THE CONVERSION OF HOME FARM COTTAGE AND THE CONSTRUCTION OF MEWS BUILDING, CABINS AND LODGES; AND A RANGE OF OTHER RETAIL, LEISURE, RECREATION, COMMUNITY AND FOOD AND DRINK-RELATED USES; HIGHEAYS INFREASTRUCTURE; THE REGRADING OF LAND TO ACCOMMODATE THE GOLF COURSE AND STAGING AND SUBSEQUENT REGRADING FOR RESIDENTIAL DEVELOPMENT; AND, WHERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF THE PUBLIC RIGHTS OF WAY NETWORK, AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS, WITH ALL MATTERS RESERVED EXCEPT FOR (IN PART) ACCESS, AND IN RESPECT OF SHORT STAY HOLIDAY ACCOMMODATION, LAYOUT
Home Farm Brough Park Richmond North Yorkshire DL10 7PJ
Full Planning Permission for Change of Use from Two Dwellings (Known as Cottages 1 and 2) to a Single Dwelling with Extension, Extension to Existing Dwelling (Known as The White House), Change of Use of Existing Stables, Tack Room and Dovecote to Form Living Accommodation (to Main House), Change of Use of Existing Stables / Storage Building to Form Ancillary Living Accommodation, Demolition of Existing Car Port as Amended by Revised Drawings 07A and 11A Received on the 30th November 2020 (which Omitted a Proposed Farm Shop from the Proposals) and Amended by Revised Drawings 21, 20, 11B, 10B, 09B, 08B and 07B Received on 29th January 2021 (which Replace the Proposed Farm Shop with Art Studio and Proposed Changes to Door and Window Openings and which Define Curtilages to the Existing and Proposed Dwellings and which Omit the Proposed Stables)