Hanger Lane Gyratory Hanger Lane Ealing W5 1DL
Minor Material Amendment (S73a) to vary condition 2 (Approved Plans) of planning permission ref: 195092VAR dated 11/11/2020 for (As varied Ref:174485FUL dated 26.11.2019)for Demolition of existing structure and erection of part 7, 9 and 13 storey building with double basement for use as student accommodation (use class sui generis) comprising up to 650 bed spaces, ground floor ancillary student facilities and study areas, cycle parking, plant, access and servicing, landscaping and public realm, and basement/ground floor retail/café/restaurant (class A1/A3) and gymnasium (class D2) commercial units. Variation seeks to rationalise room types and building facade based on modular construction, and to increase the height of the ground floor by 0.5 metres
Holiday Inn Express Victoria Road Acton Ealing W3 6UL
Demolition of existing hotel and redevelopment of the site through construction of a 35-storey building plus lower ground floor and basement comprising student accommodation (sui generis) of 699 bed spaces; construction of a 17-storey building plus lower ground floor and basement comprising 91 residential units (use class C3); ground floor commercial / retail units fronting North Acton Station Square and Victoria Road comprising 310 sqm in total; and associated works of amenity space, public realm, landscaping and other works associated with the development.
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works
Land Off Mottram Old Road, Hyde, SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of farm/agricultural buildings and stables, and associated works
Richmond House 79 Whitehall London SW1A 2NS
Provision of a temporary Chamber for the House of Commons and supporting facilities and infrastructure, including substantial demolition and redevelopment of Richmond House to create a part seven storey, part six storey building with a roof terrace and three levels of basement, to provide accommodation for parliamentary uses (Sui Generis). Refurbishment and internal and external alterations to 49, 50, 53 and 54 Parliament Street and 85 Whitehall, including a new bridge link, to provide a visitor entrance, visitor shop and workspaces for MPs and supporting staff (Sui Generis). Landscaping works to the forecourt of Richmond House and Richmond Terrace, and associated works including temporary construction works. (Linked to 19/08220/FULL). REVISED SCHEME: including amendments to stair tower on south elevation, reduction in lift overrun to Richmond Terrace, amendments to eastern elevation facing Curtis Green and roof plan to include additional planting RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts
Richmond House 79 Whitehall London SW1A 2NS
Provision of a temporary Chamber for the House of Commons and supporting facilities and infrastructure, including substantial demolition and redevelopment of Richmond House to create a part seven storey, part six storey building with a roof terrace and three levels of basement, to provide accommodation for parliamentary uses (Sui Generis). Refurbishment and external alterations to 49, 50, 53 and 54 Parliament Street and 85 Whitehall, including a new bridge link, to provide a visitor entrance, visitor shop and workspaces for MPs and supporting staff (Sui Generis). Landscaping works to the forecourt of Richmond House and Richmond Terrace, and associated works including temporary construction works. Linked to 19/08221/LBC. REVISED SCHEME: including amendments to stair tower on south elevation, reduction in lift overrun to Richmond Terrace, amendments to eastern elevation facing Curtis Green and roof plan to include additional planting. RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg 25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts
1 Old Hill Orpington BR6 6BW
Demolition of existing single storey shop and construction of an end of terrace single storey dwellinghouse with accommodation in the roof space with refuse and bike store.
The Boatyard Bolton Road Hoghton
Application to discharge condition nos. 5 (materials), 6 (construction management plan), 13 (method statement for biosecurity measures), 14 (foul and surface water treatment), 15 (construction environmental management plan), 17 (landscaping scheme), 20 (drainage strategy), 21 (construction surface water management plan), 22 (operation and maintenance manual for surface water drainage), 24 (canal risk assessment and method statement) and 25 (ground contamination) of planning permission ref: 21/01473/FULMAJ (Demolition of the former Grill & Grain Public House and erection of a two storey office building and change of use of the former annex building from ancillary accommodation to commercial use (falling within Use Classes E(a) display or retail sale of goods, other than hot food, E(b) sale of food and drink for consumption (mostly) on the premises, E(c) i financial services, E(c)ii professional services (other than medical services) and/or E(g)i office) with associated car parking, landscaping and works)
Bramshill House Bramshill Park Bramshill Hook RG27 0JW
Change of use of Bramshill Park, Bramshill House, Stable Block and Nuffield Hall / Newsam Hall for use as a wedding and events venue (Sui Generis). Change of use of Bramshill House for overnight guest accommodation associated with the wedding and events use. Change of use of Dixon Hall for use as guest accommodation associated with the wedding and events use. Change of use of Bramshill Park, Bramshill House, Stable Block and Nuffield Hall / Newsam Hall, Foxley Hall, Sports Hall, Oak Hall and Conference Centre, Reprographics and Graphics, Shop, Rowan Hall, Willow Hall and Reception for use associated with film-making activities (Sui Generis). Demolition of police college buildings. The construction of 197 new residential (Use Class C3) dwellings (a net increase of 177 dwellings Use Class C3), 147.92 sqm GIA of employment floor space (Use Class E, F.2) and undercroft car parking. Associated repair works to buildings and gardens. Refurbishment of Hazeley Lodges including demolition of modern rear extensions and structures and erection of single storey rear extensions. Associated roads, footways, cycleways, open space, creation of parkland, creation of enhanced ecological habitat, landscaping, drainage, ancillary works and infrastructure.