Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
Church Farm The Street Wiveton Holt Norfolk NR25 7TJ
Discharge of condition 3 (glazing details) and condition 7 (sections for windows and doors) on planning permission PF/22/0338 ( Alterations to dwelling house and associated external works; conversion and extension of East Stable to habitable accommodation; conversion of North Range to habitable accommodation including replacement of roof structure; construction of detached garage to north-east of house; widening of southern entrance gateway and formation of new parking and turning area on west side of Church Farm; erection of boundary walls and railings)
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.