Twyford Abbey Nursing Home Twyford Abbey Road Park Royal NW10 7DP
Details of materials for external surfaces part pursuant to condition 3 part discharge (material details for substation only) of planning permission ref: 222341FUL dated 09/02/2023 for: Development to provide a total of 326 self-contained residential units comprising; phased construction of seven blocks of flats (ranging from two to six-storeys); two two-storey detached dwellinghouses (following demolition of existing gatehouse); and a terrace of two-storey dwellinghouses in the grounds of Twyford Abbey (all Use Class C3); conversion of Twyford Abbey (Grade II Listed) into flats (Use Class C3) and provision of residents lounge; demolition of workshop attached to the Grade II listed walled garden and replacement with a single storey dwellinghouse (Use Class C3); facilitated by repair; refurbishment; infill and rooftop extensions; demolition of post-war extensions and other pre-war structures within grounds, excluding the cottage; retention and repair of the Grade II listed walled garden and attached cottage to provide ancillary facilities management accommodation and residents facilities; comprehensive landscaping works including removal and works to trees and groups of trees protected by a Tree Preservation Order; provision of permissive publicly accessible open space and grow gardens; provision of gated cycle and pedestrian access onto North Circular (A406) and new access onto Twyford Abbey Road; provision of hardstanding parking areas; ecological enhancement works; and other associated constructions works including installation of boundary treatment
Officers Mess Kendrew Barracks School Road Cottesmore Rutland LE15 7BL
Discharge of Condition 8 (Construction Management Plan) of planning application 2023/0366/FUL - Erection of a three storey Single Living Accommodation building within Use Class C2a, covered walkway and associated external works, ancillary buildings and landscaping.
18 Brambledown Road South Croydon CR2 0BL
Application to discharge condition 3 (Construction Logistics Plan) of planning permission reference 21/04705/FUL for the demolition of existing dwelling and erection of a three storey building with roof accommodation comprising 7 flats, provision of new access and crossover, 4 parking spaces, refuse store, cycle parking and landscaping
The Old Station Station Road Killamarsh Sheffield S21 1EN
Discharge of Conditions 2 (Landscaping), 4 (Boundary Treatments), 5 (Materials), 7 (Sound Mitigation), 8 (CEMP), 9 (Reptile Method Statement), 10 (Biodiversity Management Plan), 11 (Badger Survey), 13 (Site Accommodation), 15 (Highway Construction Details), 16 (Drainage) and 19 (Management and Maintenance Details) pursuant to previously approved 23/00083/FL
5 Russell Hill Purley CR8 2GH
Discharge of condition number 7 (children's playspace) attached to planning permission ref. 20/03470/FUL. (Demolition of dwellinghouse and the construction of a three-storey building above ground with accommodation in roof space and two stories of lower ground accommodation in order to provide 21 flats with associated vehicle and cycle parking, refuse store, hard and soft landscaping (amended plans and description). at 5 Russell Hill, Purley, CR8 2JB).
5 Russell Hill Purley CR8 2GH
Discharge of condition number 11 (privacy screens) attached to planning permission ref. 20/03470/FUL. (Demolition of dwellinghouse and the construction of a three-storey building above ground with accommodation in roof space and two stories of lower ground accommodation in order to provide 21 flats with associated vehicle and cycle parking, refuse store, hard and soft landscaping (amended plans and description). at 5 Russell Hill, Purley, CR8 2JB).
The Courage Hall Middleton Hall Lane Brentwood Essex CM15 8EE
Discharge of conditions 13 (Details of external materials, and window and door design materials), and 14 (Sample of panel of external materials) of application 22/00439/FUL (Demolition of existing structures, construction of a boarding house for pupils with staff accommodation, new access, landscaping and associated works).
5 Russell Hill Purley CR8 2GH
Discharge of condition number 4 (materials) attached to planning permission ref. 20/03470/FUL. (Demolition of dwelling house and the construction of a three-storey building above ground with accommodation in roof space and two stories of lower ground accommodation in order to provide 21 flats with associated vehicle and cycle parking, refuse store, hard and soft landscaping-amended plans and description).
Woolfox Golf And Country Club Hardwick Farm Lane Empingham Rutland PE9 4AQ
Discharge of Condition 12 (external lighting) in relation to 2020/1480/MAF (Erection of 60 leisure lodges for occupation on a non-continuous basis, renovation and conversion of existing barns to form a leisure suite including gym, swimming pool and ancillary spaces including staff accommodation, renovation and alteration of the existing Clubhouse, erection of a new maintenance facility, alterations to the grounds including changes to the golf course and construction of lakes for leisure and ecological purposes, and ancillary works including alterations to the access drive, provision of a visitor check-in kiosk, alterations to car parking, creation of a circular walk, alteration and extension of the noise bund, and consequential landscape works).
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.