26-34 Upper Ground London Southwark SE1 9PD
Details of Condition 4 'Archaeological Evaluation' pursuant to planning permission ref. no. 21/AP/0179 as amended by 22/AP/1704: Non-material amendment of planning permission 21/AP/0179 Construction of a part two, part five storey extensions to provide additional office accommodation (E(g)(i) Class) and associated cycle parking and refuse storage: Loading bay and columns at ground floor and three windows on part pf the north facade re-positioned; size of three windows on part of the north facade floor changed, connected column on upper levels split into three components, fourth floor terraces to have returns that wrap into the facade, layout amended, balustrade added to roof, east elevation material finish to party wall line changed from terracotta cladding panels in satin off-white glaze to glazed brick with off-white glaze and photovolatic panels increased from 73 to 82.
34 Upper Ground London Southwark SE1 9PD
Details of Condition 5 'Archaeological Pre-commencement Foundation' pursuant to planning permission ref. no. 21/AP/0179 as amended by 22/AP/1704: Non-material amendment of planning permission 21/AP/0179 Construction of a part two, part five storey extensions to provide additional office accommodation (E(g)(i) Class) and associated cycle parking and refuse storage: Loading bay and columns at ground floor and three windows on part pf the north facade re-positioned; size of three windows on part of the north facade floor changed, connected column on upper levels split into three components, fourth floor terraces to have returns that wrap into the facade, layout amended, balustrade added to roof, east elevation material finish to party wall line changed from terracotta cladding panels in satin off-white glaze to glazed brick with off-white glaze and photovolatic panels increased from 73 to 82.
Land Part Of 29 To 30 Berths Tilbury Freeport Tilbury Essex
Construction of new office accommodation within existing warehouse, replacement of doors and windows, over-spraying of existing cladding, installation of new entrance ramp and steps, replacement rooflights, installation of solar PV panels and roof-edge protection systems with removal of cold store chiller plant
Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
Barn At Birchwood Farm Dandys Ford Lane Sherfield English Hampshire
External works and alterations (retrospective) including - the construction of a new entrance porch, new chimney, replacement cladding and external materials to the walls and roof and new windows and doors to allow the change of use of the building for uses incidental to the principal use of the dwelling known as Birchwood Farm as a home office, overnight guest accommodation, and the provision of new welfare facilities including toilet and shower in addition to agricultural use
26-34 Upper Ground London Southwark SE1 9PD
Non-material amendment of planning permission 21/AP/0179 Construction of a part two, part five storey extensions to provide additional office accommodation (E(g)(i) Class) and associated cycle parking and refuse storage: Loading bay and columns at ground floor and three windows on part pf the north facade re-positioned; size of three windows on part of the north facade floor changed, connected column on upper levels split into three components, fourth floor terraces to have returns that wrap into the facade, layout amended, balustrade added to roof, east elevation material finish to party wall line changed from terracotta cladding panels in satin off-white glaze to glazed brick with off-white glaze and photovolatic panels increased from 73 to 82.
Quernmore House Littledale Road Quernmore Lancaster Lancashire LA2 9EN
Change of use of two dwellings (C3) and office (use class E) into one dwelling (C3) including demolition of conservatory and porch, erection of single storey front/side and two storey side extensions, installation of a raised roof and construction of two dormer extensions to the front and one dormer extension to the rear, installation of rooflight windows, conversion of detached building to create two storey ancillary accommodation, erection of detached garage, alterations to land levels, installation of sewage treatment plant and ground source heating system, creation of associated access and parking area
11 Moor Lane Lancaster Lancashire
Change of use of shop and offices (E) to for student accommodation comprising four studio flats, two 3 bed flats, and three 1 bed flats (C3) with ancillary communal accommodation including 2 communal lounge areas, plant room, WC and laundry room, installation of replacement windows and roof lights, partial demolition of single storey outrigger and construction of bin store and bike store
Parkside Grove Road Weston-super-Mare BS23 2AR
Non-material amendment to application 19/P/1246/FUL (Change of use of from office (Use Class B1a) to student accommodation (Use Class Sui Generis) together with warden accommodation, associated student facilities, creation of an additional storey to the premises and vehicle parking) to allow for design changes comprising: GRP zinc capping detail included around dormer windows and on verge flashing of the mansard roof; Lobby room located adjacent to dance studio relocated to internal courtyard and installation of new external door into courtyard from lobby room; GRP enclosure for Low Voltage (LV) room constructed as single storey building in courtyard and construction of tank room adjacent to LV room to store services; Single storey lobby area adjoining lift shaft increased in height; Exterior of the lift shaft below the level of the mansard roof finished in render; Brick soldier course beneath the mansard roof removed; Column on the Post Office Lane elevation finished in brick to the second level with the top rendered grey; The double hand-rail on the Grove Road entrance replaced with a single rail; Enlargement of bin store door from Grove Road; Position of downpipes amended; The roller shutter which provides access into the basement car park/courtyard area replaced by a gate.