108 High Street Gosport Hampshire PO12 1DU
ERECTION OF A FIRST AND SECOND FLOOR EXTENSION, EXTERNAL ALTERATIONS INCLUDING NEW WINDOWS AND DOORS, ALTERATIONS TO SHOPFRONT, CHANGE OF USE OF THE REAR GROUND FLOOR AND UPPER FLOORS FROM RETAIL (CLASS E) TO SERVICED ACCOMMODATION (CLASS C1 HOTELS) (CONSERVATION AREA) (AMENDED PROPOSAL TO APPLICATION 22/00333/FULL) (as amended by plans received 19.07.23 and 08.08.23)
Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23 December 2022 (RN: 22/05428/FULL) for 'Two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment', NAMELY to enable the removal of specified louvres, relocation of the generator, façade updates at ground floor level, installation of safety balustrading, relocation of the consented UKPN access, creation of a separate ground floor access for the crown amenity space and installation of additional sliding doors at Level 30.
22 Potter Hill Pickering North Yorkshire YO18 8AA
Change of use of existing ground floor retail space and existing first floor domestic accommodation and second floor loft to a four bedroom residential dwelling (Use Class C3) and attached foot health clinic, erection of single storey rear extension to form covered area for the dwelling and installation of 2no. dormer windows and 4no. rooflights
13 Castle Street And 25 Parliament Square Hertford Hertfordshire SG14 1EX
Single storey rear infill extension, alterations to fenestration to the rear with replacement window in existing dormer window. Existing roofs made good, reforming of C16 roof and demolition of rear outbuildings. New internal walls erected to allow for the creation of a ground floor corridor and one 1 bedroom dwelling on the ground floor, with the installation of a WC to the retail units and kitchen and bathroom to the residential accommodation. Internal walls added to create shower rooms and installation of kitchens to create two 2 bedroom first and second floor apartments.
41-43 St Andrew Street Hertford Hertfordshire SG14 1HZ
Change of use of St Nicholas Hall and the School Room and the first floor of the Verger's House from A1 (retail) to C3 (residential) use to provide one self-contained dwelling and one first floor residential flat, with associated parking and landscaping. Removal of lean-to extension, porch, external covered area, corrugated sheet roofing and steel support. Enlargement of 4 dormers, enlargement of window openings, new external doors, infill existing external door, 5 new rooflight openings, new first floor window. Variation of condition 2 (approved plans) of planning permission: 3/20/1652/FUL - To amend the layout of the first-floor shower and en-suite in St Nicholas Hall and to revise the welfare accommodation for the shop unit.
1-3 Killinghall Road And 93 Greenhill Lane Bradford West Yorkshire BD3 8DN
Two-storey rear extension and change of use of existing retail spaces to ground and first floor to catering kitchen, and maintain associated accommodation to second floor, changes to shop fronts, new signage, installation of extraction system and construction of front dormer window
N I O C House 4 - 8 Victoria Street London SW1H 0NE
Variation of condition 1 of planning permission dated 30 May 2022 (RN:22/02156/FULL) for the Variation of condition 1 of planning permission dated 26 May 2021 (RN: 21/01109/FULL) (which varied conditions 1, 6 and 13 and removed conditions 8 and 18 of planning permission dated 11 September 2019 (RN 19/03450/FULL)) for 'Refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1) purposes and Class A3 (cafe/restaurant) purposes and gym (Class D2) at basement level; terraced infilling of central courtyard, creation of roof terraces together with green roofs; reconfiguration and provision of additional plant accommodation at basement and roof level; replacement windows and new entrances together with new shopfronts; new layout at ground level for accessible parking and refuse store; cycle parking and showers and servicing at basement level, to amend the approved drawings to reflect design and technical development changes post planning permission, including alterations to proposed roof plant, removal of green walls and retention and refurbishment of pentagon roof. Namely amendment to layout at floor 8 to extend it and consequential amendment at roof level.
108 High Street Gosport Hampshire PO12 1DU
ERECTION OF FIRST AND SECOND FLOOR EXTENSIONS, EXTERNAL ALTERATIONS INCLUDING NEW WINDOWS, ALTERATIONS TO SHOPFRONT, CHANGE OF USE OF THE REAR GROUND FLOOR AND UPPER FLOORS FROM RETAIL (CLASS E) TO SERVICED ACCOMMODATION (USE CLASS C1 HOTELS) (CONSERVATION AREA) (as amended by plans received 28.02.23 and amplified by documents received 17.03.23) (amended plans and description)
Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
6 Broad Street Place London EC2M 7JH
Change of use of lower ground floor from part betting shop (Sui Generis) and part office (Use Class E) to retail and office (Use Class E), and change of use of part ground floor from retail to office use (Use Class Eg) and alteration and extension, including: (i) new and replacement windows to the facade at all levels; (ii) removal of existing rooftop plant enclosure and erection of one storey roof extension at seventh floor to provide office (Use Class E) with erection of plant room and fire escape above and creation of private terrace at roof level; (iii) new shopfronts and office entrance at ground floor level with reconfiguration of retail space; (iv) rear partial infill extension from first to sixth floors to provide office accommodation (Use Class E); and ancillary works.