Land Parcel At 525627 145487 Reigate Road Sidlow Surrey
The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadly comprise a series of linear rows (also known as arrays) of photovoltaic (PV) solar modules, together with inverter platforms; control room; DNO station; storage containers; battery storage; security fencing & CCTV; temporary construction compound; and enhanced landscaping & ecological management. As amended on 30/01/2023, 24/04/2023, 18/07/2023, 04/10/2023, 16/10/2023, 18/10/2023, 27/10/2023 and on 16/11/2023
Land To The East Of Lyde Green Road Emersons Green South Gloucestershire
Discharge of condition 6 (Fencing), attached to planning permission P20/06681/F Construction of Multi User Path as part of wider Multi User Route to connect development at Lyde Green Farm (subject to planning application P19/1275/F) to Lyde Green Road.
Broad Oak Farm Sweechgate Broad Oak Sturry CT2 0QR
Non-material amendment to planning permission CA/18/00868/FUL for the hybrid planning application comprising: detailed/full application for development of 456 residential dwellings comprising 402 houses and 54 flats, with associated open space, landscaping, car parking, access and other infrastructure (following demolition of 52 Shalloak Road, existing agricultural buildings and structures); and outline application (with all matters reserved) for development of a commercial area with up to 212sqm of Class A1 and up to 593sqm of Class B1 use; to allow fences to plots 336-338, footprint to flat blocks 348-395 and 366-377 updated, removal of screen wall to flat parking court entrances, materials to include product names and housing types amended from Dewhurst to Nuthurst, change of roof tile spec to monbond mini stonewold, closeboard fences to panel fencing and curved screen walls to chamfer, boundary treatments to show screenwalls to closeboard fence plots 28, 31, 75, 79, 103-108, 109-115, 165, 167 and 172, hardstanding added to plots 188 and 194, block paving to plots 408 and 412 extended, road surfaces and raised tables updated, plot 178 garage relocated, plots 162 and 163 compliance M4(2) removed and 71 and 269 M4(2) compliance added and parking, plots 150-151 and 155-156 carports combined, plot 150 relocated to north, Fairway plots 67-67,216-217,242-243 and 258-259 handed, driveway surface reduced to plots 25,179,194,203-204,233,309-312,326-327,330 and 335, grass verge added opposite 221-225, Layton type; roof construction, rainwater pipes, standardise tile hanging to Earleswood and Hereford and rainwater pipes revised, flat blocks; side doors omitted, window depth reduced to bathrooms, full brick cills indicated, inclusion of lift shaft, Barratt type; 73 fogs revised ground floor layouts, lutterworth front entrance canopy enlarged, Chester stone sills omitted and replaced with brick, updated carports to plots 155-156 and 4 bay carport omitted.
Land East Of Rutton Farm Rull Lane Whimple EX5 2NX
Construction and operation of a ground mounted solar farm, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment, landscaping and associated development
Land Near Pelham Substation Maggots End Road Manuden Hertfordshire
S62A/2022/0011 - Construction and operation of a solar farm comprising ground mounted solar photovoltaic(PV) arrays and battery storage together with associated development including inverter cabins, DNO substation, customer switchgear, access, fencing,CCTV cameras and Landscaping
Land East Of Main Road Swardeston Norfolk
Construction and operation of Energy Balancing Infrastructure (EBI) comprising energy storage technology, to form up to two areas of modular or containerised structures. To include containerised or modular battery array, transformers and inverter area, switchgear and control room building(s), connection of EBI plant to the Hornsea Three Onshore Converter Station (ONCS), required access and internal roads, drainage systems, perimeter and internal fences, and required external lighting and lightning pylons. Development is located within the Hornsea Three ONCS area as consented by the Hornsea Project Three Offshore Wind Farm Development Consent Order (DCO) in December 2020. The application is accompanied by an environmental statement.
Land At Marsh Green Farm Marsh Green EX5 2EU
Construction and operation of a ground mounted solar farm and associated landscaping and ecological habitat, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment and associated development; temporary change of use of land for construction compound (off site)
Land West Of Thaxted Cutlers Green Lane Thaxted Essex
Construction and operation of a solar farm comprising ground mounted solar photovoltaic (PV) arrays and battery storage together with associated development, including inverter cabins, DNO substation, customer switchgear, access, fencing, CCTV cameras and landscaping.
Land Adjacent To Peradon Farm Clyst Hydon
Construction of 49 MW solar farm, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, CCTV, ancillary equipment, and associated development.
Highwood Land East of Worthing Road Highwood RH12 1DU
Non Material Amendment to previously approved application DC/15/1794 (Approval of Reserved Matters in respect of the provision of allotments with associated landscape works following outline approval for development primarily of up to 1044 dwellings including provision of employment floor space, fire station, community centre and expanded school facilities. Construction of a principal vehicular access from A24 (southbound) together with secondary bus/cycle/pedestrian accesses from Hills Farm Lane, internal highway network, diversion of existing public footpaths and a replacement footbridge over A24. Formation of associated landscape works including playing fields, allotments, recreation facilities and construction of acoustic bund/fence alongside A24 (Outline) DC/09/2138 as amended by DC/11/2004) Amendments to communal shed and raised planters relocated and hard landscape areas.