Land To The North Of White Cross Lane Burton Gorse Sleaford
Application to vary conditions 6 (construction phase ecological mitigation strategy), 7 (landscape and ecological management plan), 8 (tree/ hedgerow protection scheme) and 11 - (approved plans) of planning permission 19/0863/FUL - Proposed solar farm (32MW) and associated development including substation, inverter cabins, switchgear/communications buildings and access track. To reflect differences between approved plans and drawings, and the as built development
Land Parcel At 525627 145487 Reigate Road Sidlow Surrey
The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadly comprise a series of linear rows (also known as arrays) of photovoltaic (PV) solar modules, together with inverter platforms; control room; DNO station; storage containers; battery storage; security fencing & CCTV; temporary construction compound; and enhanced landscaping & ecological management. As amended on 30/01/2023, 24/04/2023, 18/07/2023, 04/10/2023, 16/10/2023, 18/10/2023, 27/10/2023 and on 16/11/2023
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works
Land Off Mottram Old Road, Hyde, SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of farm/agricultural buildings and stables, and associated works
Broad Oak Farm Sweechgate Broad Oak Sturry CT2 0QR
Non-material amendment to planning permission CA/18/00868/FUL for the hybrid planning application comprising: detailed/full application for development of 456 residential dwellings comprising 402 houses and 54 flats, with associated open space, landscaping, car parking, access and other infrastructure (following demolition of 52 Shalloak Road, existing agricultural buildings and structures); and outline application (with all matters reserved) for development of a commercial area with up to 212sqm of Class A1 and up to 593sqm of Class B1 use; to allow fences to plots 336-338, footprint to flat blocks 348-395 and 366-377 updated, removal of screen wall to flat parking court entrances, materials to include product names and housing types amended from Dewhurst to Nuthurst, change of roof tile spec to monbond mini stonewold, closeboard fences to panel fencing and curved screen walls to chamfer, boundary treatments to show screenwalls to closeboard fence plots 28, 31, 75, 79, 103-108, 109-115, 165, 167 and 172, hardstanding added to plots 188 and 194, block paving to plots 408 and 412 extended, road surfaces and raised tables updated, plot 178 garage relocated, plots 162 and 163 compliance M4(2) removed and 71 and 269 M4(2) compliance added and parking, plots 150-151 and 155-156 carports combined, plot 150 relocated to north, Fairway plots 67-67,216-217,242-243 and 258-259 handed, driveway surface reduced to plots 25,179,194,203-204,233,309-312,326-327,330 and 335, grass verge added opposite 221-225, Layton type; roof construction, rainwater pipes, standardise tile hanging to Earleswood and Hereford and rainwater pipes revised, flat blocks; side doors omitted, window depth reduced to bathrooms, full brick cills indicated, inclusion of lift shaft, Barratt type; 73 fogs revised ground floor layouts, lutterworth front entrance canopy enlarged, Chester stone sills omitted and replaced with brick, updated carports to plots 155-156 and 4 bay carport omitted.
Park Farm Belsteads Farm Lane Chelmsford Garden Community Chelmsford CM3 3PX
Details pursuant to Condition 11 (Construction Environmental Management Plan) of planning permission ESS/99/22/CHL. ESS/99/22/CHL was for Temporary compound associated with the operation of the Park Farm mineral extraction area at Bulls Lodge Quarry comprising the parking of contractors plant and machinery, a mobile welfare unit, operatives caravan accommodation, associated car parking and ancillary development and landscaping.
Land East Of Rutton Farm Rull Lane Whimple EX5 2NX
Construction and operation of a ground mounted solar farm, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment, landscaping and associated development
Land Near Pelham Substation Maggots End Road Manuden Hertfordshire
S62A/2022/0011 - Construction and operation of a solar farm comprising ground mounted solar photovoltaic(PV) arrays and battery storage together with associated development including inverter cabins, DNO substation, customer switchgear, access, fencing,CCTV cameras and Landscaping
Land At Marsh Green Farm Marsh Green EX5 2EU
Construction and operation of a ground mounted solar farm and associated landscaping and ecological habitat, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment and associated development; temporary change of use of land for construction compound (off site)
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan