Oak Farm Tofts Lane Sheffield S6 5SL
Use of existing properties (Oak Farm and Oak House) as assisted living (Use Class C2) with ancillary facilities including storage, parking and landscaping (retrospective) and erection of side extension to Oak House to provide additional living accommodation
Monks Cottage Eastleach Cirencester Gloucestershire GL7 3NQ
Change of land use from agricultural to residential; erection of 2no. detached buildings and engineering works to provide an indoor/outdoor pool house and sauna; conversion, extension and alteration of 4no. existing detached barns to provide ancillary accommodation, yoga studio, music studio and home gym; erection of garage extension to form a carport and associated demolition, access and landscaping works (part retrospective)
Glebe Farm Low Street Kirkby Fleetham Northallerton North Yorkshire DL7 0SP
Change of Use of Agricultural Land for the Formation of Private Equestrian Arena (no illumination), Change of Use of an Existing Agricultural Building to Private Equestrian Uses, Change of Use of Existing Agricultural Land to a Mixed Use of Agriculture and Equestrian, Provision of a Corral Area, the Formation of a Concrete Hardstanding, Formation of a Hardcore Hardstanding for the Stationing of Private Equestrian and Agricultural Vehicles (partly retrospective), Formation of a Peripheral Bund and Landscaping, and the Temporary Retention of a Home Office Structure and Two Shipping Containers (retrospective)
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)