Nuffield Health Tees Hospital Junction Road Norton Stockton-On-Tees TS20 1PX
Information to discharge conditon no4 (Construction Management and Methodology Plan) of planning approval 23/1408/FUL - Erection of a part two storey part single storey modular building for the creation of 2no theatres attaching to the existing theatre building by a link corridor with associated external alterations to the existing buildings. Installation of hardstanding for additional cark parking to include 2no EV charging stations to the southern car park and alterations to northern car park. Alterations to access and boundary treatments. Erection of 1no portable building and associated soft landscaping (removal of 3no cabins)
69 Warden Hill Road Luton LU2 7AE
Erection of a three bedroom attached dwellinghouse and erection of a two storey rear extension with alterations to the roof and fenestration including moving the front door of the existing dwellinghouse. Discharge of conditions 3 (materials), 5 (landscaping), 7 (surfacing & drainage), 10 (boundary treatment) and 11 (construction management plan) of planning permission 21/01434/FUL dated 18th February 2022.
164 Spring Lane Lambley Nottinghamshire NG4 4PE
Application to vary condition 2 (approved plans) of planning permission 2022/0173 (Full planning application for the demolition of existing buildings and replace with 5 No. Dwellings). Variations include erection of four garages, internal alterations and addition of solar panels. Variation of conditions 3 (materials), condition 6 (Construction Emissions Management Plan), condition 8 (boundary treatment), condition 9 (hard and soft landscape works) in that further details have been submitted to address these conditions.
Norwood Cemetery Norwood High Street London SE27 9JU
Approval of details pursuant to Conditions 3 (Method of Construction Statement), 5 (window/door sections), 6 (Maintenance Plan), 7 (boundary treatments), 8 (landscaping scheme), 13 (bin storage), 14 (Travel Plan), and 15 (Parking Management Plan)of planning permission 18/03038/RG3 (Conversion of cemetery lodge building into a visitor centre at ground floor level and relocation of bereavement services to first floor level including associated internal and external alterations and the erection of a single storey side extension, new pedestrian access with associated changes to boundary treatment and landscaping.) granted on 19.03.2019
Winterdale Manor Enterprise Centre Southminster Road Althorne Essex
Compliance with conditions notification 23/00303/FUL (Erection of commercial building consisting of five units for use class E purposes and accessible toilet. New cycle parking area (to replace that previously approved by application FUL/MAL/22/00126). New refuse and recyclable storage area and fence (to replace that previously approved by application FUL/MAL/22/00126). Alteration to parking area (revision to application FUL/MAL/22/00126). New area of hardstanding to south of new building.) Condition 5 - A Great Crested Newt Method Statement. Condition 6 - A Biodiversity Enhancement Strategy. Condition 7 - A lighting design scheme for biodiversity. Condition 12 - Construction management plan. Condition 18 - External illumination. Condition 19 - Surface water drainage scheme. Condition 20 - Foul drainage scheme. Condition 21 - Size and nursery stock of the proposed specimens. Condition 22 - Boundary details. Condition 23 - Waste Management Plan. Condition 24 - Hard landscape works. Condition 25 - Cycle parking. Condition 26 - Car parking layout.
159 Acre Lane London SW2 5UA
Variation of condition 2 (Approved Plans) of planning permission 18/04939/FUL (Erection of a head house to the rear of the land, together with hard and soft landscaping, new boundary treatments and alterations to the permanent access from Kings Avenue including the installation of a new entrance to the rear, plus the provision of temporary access from Acre Lane to facilitate construction) granted on 01.02.2020. Variation sought: relocate the access point on Kings Avenue to nearer the Head House. Amended boundary treatment and reduction in the footprint of the Head House.
159 Acre Lane London SW2 5UA
Approval of details pursuant to condition 8 (soft landscape maintenance strategy) of Planning permission reference 18/04939/FUL (Erection of a head house to the rear of the land, together with hard and soft landscaping, new boundary treatments and alterations to the permanent access from Kings Avenue including the installation of a new entrance to the rear, plus the provision of temporary access from Acre Lane to facilitate construction) Granted on 08.02.2019.
159 Acre Lane London SW2 5UA
Approval of details pursuant to Condition 3 (Schedule of all materials ) and Condition 4 (Detailed construction drawings) of planning permission 18/04939/FUL (Erection of a head house to the rear of the land, together with hard and soft landscaping, new boundary treatments and alterations to the permanent access from Kings Avenue including the installation of a new entrance to the rear, plus the provision of temporary access from Acre Lane to facilitate construction.) granted on 08.02.2019
Brentwood Borough Council Chelmsford Essex CM15 8AY
Land South Of A127 East Of M25 Junction 29 Codham Hall Codham Hall Lane Great Warley Essex - Regulation 25 Submission: Brentwood Borough Council gives notice that further information has been submitted in support of the hybrid planning application with reference 22/00402/FUL, such further information seeking to remove the outline element of the application relating to the M25 to B186 link road (Phase 2) and making alteration to the application site boundary (to remove the outline element and land adjacent to Jax Folly). The following is the revised description of development for the application. Full planning application seeking detailed planning permission for demolition of existing buildings and structures; ground works to enable creation of development plots; highways works including construction of new A127 overbridge, access to B186, site roads and construction of M25 J29 to B186 link road (phase 1), erection of buildings for Class B8 (Storage and Distribution) and/or Class B2 (General Industrial) use within ancillary office space (within Class E); landscaping, infrastructure and enabling works including diversion of public rights of way. The further information relates to the Environmental Statement, including a Statement of Conformity Letter considering the implications for the changes to the red line boundary of the proposed development for the following topics: Socio-economics, Waste and Resources, Traffic and Transport, Air Quality, Noise and Vibration, Ground Conditions, Water Resources and Flood Risk, Ecology, Climate Change and Greenhouse Gas Emissions, Landscape and Visual Impact Assessments and Built Heritage.
Land South Of A127 East Of M25 Junction 29 Codham Hall Codham Hall Lane Great Warley Essex
Regulation 25 Submission: Brentwood Borough Council gives notice that further information has been submitted in support of the hybrid planning application with reference 22/00402/FUL, such further information seeking to remove the outline element of the application relating to the M25 to B186 link road (Phase 2) and making alteration to the application site boundary (to remove the outline element and land adjacent to Jax Folly). The following is the revised description of development for the application. Full planning application seeking detailed planning permission for demolition of existing buildings and structures; ground works to enable creation of development plots; highways works including construction of new A127 overbridge, access to B186, site roads and construction of M25 J29 to B186 link road (phase 1), erection of buildings for Class B8 (Storage and Distribution) and/or Class B2 (General Industrial) use within ancillary office space (within Class E); landscaping, infrastructure and enabling works including diversion of public rights of way. The further information relates to the Environmental Statement, including a Statement of Conformity Letter considering the implications for the changes to the red line boundary of the proposed development for the following topics: Socio-economics, Waste and Resources, Traffic and Transport, Air Quality, Noise and Vibration, Ground Conditions, Water Resources and Flood Risk, Ecology, Climate Change and Greenhouse Gas Emissions, Landscape and Visual Impact Assessments and Built Heritage.