Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
West Garth Belgrave Drive Sheffield S10 3LQ
Application to allow development to commence following installation of tree protection measures but prior to submission of a detailed landscape scheme (Application under Section 73 to replace condition no. 3 (Landscape and Ecological Management Plan); As imposed by 23/00453/FUL - Demolition of existing garage and erection of a new detached double garage with a connecting glass link to the main house, erection of a glazed corner extension at ground floor level and erection of a ground floor garden room extension with basement level on the footprint of the existing demolished garage, alterations to roof to include re-covering, front dormer window and roof lights, provision of renewable energy sources, provision of associated hard and soft landscaping to the front and the rebuilding of existing stone boundary wall)
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Discharge of planning obligation Schedule 9, Clause 3.1 (Be Seen Energy Performance Indicators) of the Section 106 Agreement associated with planning permission 22/AP/1347 'Minor material amendments to planning permission 20/AP/1537 [approval date: 06.05.2021] for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses. The amendments comprise: - basement and structural alterations including deepened and extended basement and revised piling approach; - cross laminated timber floor construction changed to concrete plank system; - addition of external structural columns on Sawyer Street façade; - internal reconfiguration including consolidation of cores, relocated refuse store, revised cycle parking and end of journey facilities, revised affordable workspace and community auditorium design; - fire strategy updates; - external alterations to doors and repositioning of south-east external stair; - relocation of visitor cycle parking; - rooftop amendments including revised swimming pool and atrium, revised roof plant enclosures, revised Community Pavilion layout, provision of additional office space; and - the addition of 37 more trees.'.
Cuerden Hall Shady Lane Cuerden Bamber Bridge Preston PR5 6AZ
Change of use of vacant care home (Use Class C2) to residential dwelling (Use Class C3) with associated staff and guest accommodation; internal and external repair/refurbishment works and alterations; selective demolition; extension including orangery, staircase enclosure, creation of swimming pool with glazed enclosure, and two storey extension to service buildings in south west corner of stableyard; hard and soft landscaping works including associated structures and landscape features including reinstatement of dilapidated pond; construction of gate lodges and secondary gates to access road; removal of driveway bridge crown and repair of tunnel; provision of associated car parking; together with other associated development
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Minor material amendments to planning permission 20/AP/1537 [approval date: 06.05.2021] for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses. The amendments comprise: - basement and structural alterations including deepened and extended basement and revised piling approach; - cross laminated timber floor construction changed to concrete plank system; - addition of external structural columns on Sawyer Street façade; - internal reconfiguration including consolidation of cores, relocated refuse store, revised cycle parking and end of journey facilities, revised affordable workspace and community auditorium design; - fire strategy updates; - external alterations to doors and repositioning of south-east external stair; - relocation of visitor cycle parking; - rooftop amendments including revised swimming pool and atrium, revised roof plant enclosures, revised Community Pavilion layout, provision of additional office space; and - the addition of 37 more trees.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
Crown Court 1 Pocock Street London Southwark SE1 0BT
Details of Condition 3 (relating to Tree Protection measures), as required by planning permission 20/AP/1537 dated 06.05.2021 for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses.
Land At Pye Corner Merriott Road Merriott TA16 5NJ
Demolition of existing steel open sided barn, and change of use of site to residential. Conversion and extension of existing stone barn to a single storey dwelling with new detached garage and the construction of three two storey detached houses and garages, with associated courtyard, parking and garden areas. Development to provide a total of four dwelling units. (Application to vary condition 2(approved plans) of approval 19/01021/FUL (as varied by 20/01684/S73) to allow changes to Plot 1, the Barn conversion. Alteration to rear elevation to provide wider doors with glazed gable over for improved light and views to tree lined boundary.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works NAMELY, to allow alterations including alterations at ground floor level and at 10th floor roof level including a new roof top room, roof terrace and alterations to plant enclosure at 19-35 Baker Street, new risers at 3rd floor to roof level at 30 Gloucester Place, introduction of increased flexibility to the commercial units across the ground floor and to remove the existing tree situated directly to the front of the newly approved entrance and replace it with a new tree to the south-west corner of Gloucester Place.