Canada Water Masterplan - Land Bounded By Lower Road (West), Redriff Road (South), Quebec Way (East) Surrey Quays Road And Canada Water Dock (North) And Site At Roberts Close London SE16
Discharge of Schedule 7, Clause 4.1 'Tree Planting Off Site Plan' of the Section 106 Agreement attached to planning permission 18/AP/1604 for 'Hybrid application seeking detailed planning permission for Phase 1 and outline planning permission for future phases, comprising: Outline planning permission (all matters reserved) for demolition of all existing structures and redevelopment to include a number of tall buildings comprising the following mix of uses: retail (Use Classes A1-A5), workspace (B1), hotel (C1), residential (C3), assisted living (C2), student accommodation, leisure (including a cinema)(D2), community facilities (including health and education uses)(D1), public toilets, nightclub, flexible events space, an energy centre, an interim and permanent petrol filling station, a primary electricity substation, a secondary entrance for Surrey Quays Rail Station, a Park Pavilion, landscaping including open spaces and public realm, works to Canada Water Dock, car parking, means of access, associated infrastructure and highways works, demolition or retention with alterations to the Press Hall and/or Spine Building of the Printworks; and Detailed planning permission for the following Development Plots in Phase 1: Plot A1 (south of Surrey Quays Road and west of Deal Porters Way) to provide uses comprising retail (A1-A5), workspace (B1) and 186 residential units (C3) in a 6 and 34 storey building, plus basement; Plot A2 (east of Lower Road and west of Canada Water Dock) to provide a leisure centre (D2), retail (A1-A5), and workspace (B1) in a 4, 5 and 6 storey building, plus basement; Plot K1 (east of Roberts Close) to provide 79 residential units (C3) in a 5 and 6 storey building; Interim Petrol Filling Station (north of Redriff Road and east of Lower Road) to provide a petrol filling station with kiosk, canopy and forecourt area. Each Development Plot with associated car parking, cycle parking, landscaping, public realm, plant and other relevant works.
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Discharge of planning obligation Schedule 9, Clause 3.1 (Be Seen Energy Performance Indicators) of the Section 106 Agreement associated with planning permission 22/AP/1347 'Minor material amendments to planning permission 20/AP/1537 [approval date: 06.05.2021] for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses. The amendments comprise: - basement and structural alterations including deepened and extended basement and revised piling approach; - cross laminated timber floor construction changed to concrete plank system; - addition of external structural columns on Sawyer Street façade; - internal reconfiguration including consolidation of cores, relocated refuse store, revised cycle parking and end of journey facilities, revised affordable workspace and community auditorium design; - fire strategy updates; - external alterations to doors and repositioning of south-east external stair; - relocation of visitor cycle parking; - rooftop amendments including revised swimming pool and atrium, revised roof plant enclosures, revised Community Pavilion layout, provision of additional office space; and - the addition of 37 more trees.'.
River Derwent Corridor Including Sites From Darley Abbey Little Chester Chester Green North Riverside Bass Rec' Pride Park To Alvaston Park Derby
Outline Application With Full Details Of 'Package 1' For Flood Defence Works Along The River Corridor Involving; Demolition Of Existing Buildings, Boundary Treatments And Flood Defence Walls, Removal Of Existing Flood Embankments, Vegetation And Trees, The Raising, Strengthening, Realigning And Construction Of New Flood Defence Walls, Embankments, Access Ramps And Steps, Demountable Flood Defences And Flood Gates, The Construction Of Replacement Buildings, Structures And Community Facilities, Alterations To Road, Footpath And Cycleway Layouts Along With Associated And Ancillary Operational Development In The Form Of Ground Works, Archaeological Investigation Works And Landscaping Works To Reinstate Sites With Environmental Enhancements Included - Discharge of condition 48 of previously approved permission 02/15/00210/OUT
West Cornforth Primary School High Street West Cornforth Ferryhill DL17 9HP
Discharge of condition 9 (Post development tree survey) and 10 (travel plan) pursuant to planning approval DM/20/01142/FPA - Proposed extensions and alterations to provide 26 place nursery and associated accommodation
Vauxhall Bus Station Bondway London
Application for a non-material amendment following a grant of Planning Permission ref : 17/04741/FUL (Redevelopment of the site involving demolition of existing bus station and erection of a 3 storey building at the northern end for bus-related operational use with part retail (Use Class A1) at ground floor level, and a single storey building at the southern end for bus-related operational use. Installation of main bus station canopy; new and replacement bus shelters; alterations to existing vent shaft and lift shaft; installation of pissoir, temporary kiosk and associated works) granted 09/02/2018. Amendment sought: Phase the development into Phase 1 and Phase 2 works Amend wording to Conditions 18 (NRMM), 19 (Construction Management Plan), 20 (Temporary Bus stops) and 28 (Tree Protection) to allow for Phase 1 works to commence prior to their discharge
Tower Bridge Business Complex 100 Clements Road London Southwark
Partial Discharge. Details of Condition 49(b) (Tree Protection Plan), Phase 1 only. As required by planning permission 17/AP/4088 (Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed use scheme providing up to 1,418 residential units, up to 3,436 sqm GEA of flexible Class A1/A3/A4 floorspace, up to 14,666 sqm GEA of flexible Class B1 floorspace, up to 869 sqm GEA of flexible Class D1/D2 and up to 3,311 sqm GEA of multi use floorspace (A1/A3/A4/D1) within Building BF-F, a new secondary school, in buildings ranging from 6 to 36 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, childrens' playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and other associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme providing up to 130 residential units and up to 780 sqm GEA of flexible A1/A3/A4/D1/Sui Generis Uses and other associated works)
Dolphin House Ashurst Drive Cheadle Heath Stockport SK3 0XB
Discharge of Conditions 3 (Testing and Validation of Imported Materials) and 6 (Tree Planting and Biodiversity Enhancement Measures) of Planning Permission reference DC/072506 for Elevational alterations to Dolphin House, including works to create a brick and glazed entrance area, insertion of doors, installation of externally mounted metal escape stair, new access ramp, new ballustrading to existing access ramp, siting of sprinkler tank and pump house upon area of car park, installation of roof mounted plant, including a 130 square metre plant area, hard surface landscaping, segregated recycling and waste management area, erection of boundary treatments, and associated works, in association with the use of the building for Use Class B1 offices, research and development, processes and ancillary functions.
River Derwent Corridor Including Sites From Darley Abbey Little Chester Chester Green North Riverside Bass Rec' Pride Park To Alvaston Park Derby
Outline Application With Full Details Of 'Package 1' For Flood Defence Works Along The River Corridor Involving; Demolition Of Existing Buildings, Boundary Treatments And Flood Defence Walls, Removal Of Existing Flood Embankments, Vegetation And Trees, The Raising, Strengthening, Realigning And Construction Of New Flood Defence Walls, Embankments, Access Ramps And Steps, Demountable Flood Defences And Flood Gates, The Construction Of Replacement Buildings, Structures And Community Facilities, Alterations To Road, Footpath And Cycleway Layouts Along With Associated And Ancillary Operational Development In The Form Of Ground Works, Archaeological Investigation Works And Landscaping Works To Reinstate Sites With Environmental Enhancements Included. - Discharge of conditions 50, 51 & 52 of previously approved application 02/15/00210 in relation to Parkers Piece, City Road
Jurys Bristol Hotel Prince Street Bristol BS1 4QF
Application for approval of details reserved by condition 5 (Highway works) of permission 18/06450/F, which approved external alterations to the Shore Bar, River Grille Restaurant and The Meeting and Events Centre, including the replacement of glazing and a new entrance lobby to the restaurant; refurbishment of the existing terrace and external seating area to the Shore Bar; creation of new terraces to the Meeting and Events Centre on Narrow Quay; and the creation of a waste and recycling area on the Assembly Rooms Lane elevation. This application seeks to discharge pre-commencement condition 5 of the planning permission relating to highway works. The condition is as follows: Prior to commencement of development general arrangement plan(s) indicating the following works to the highway shall be submitted and approved in writing by the Local Planning Authority: - Bollards - Street lighting - Removal of cobbles Indicating proposals for: - Threshold levels of the finished highway and building levels - Alterations to waiting restrictions or other Traffic Regulation Orders to enable the works - Locations of lighting, signing, street furniture, street trees and pits - Structures on or adjacent to the highway - Extents of any stopping up or dedication of new highway These works shall then be completed prior to first occupation of the development to the satisfaction of the Local Highway Authority and as approved in writing by the Local Planning Authority. Reason: In the interests of public safety and to ensure that all road works associated with the proposed development are planned and approved in good time to include any statutory processes, are undertaken to a standard approved by the Local Planning Authority, and are completed before occupation.