Rear Of 31 Derwent Avenue Luton LU3 2DX
Erection of detached 3 bed chalet bungalow - Minor Material Amendment of Planning Permission 18/00521/FUL dated 13th July 2018 (construction of side dormer, additional velux roof light and changes to fenestration details and internal layout). Discharge of conditions 4 (Landscaping scheme), 5 (Surfacing and drainage), 9 (Boundary treatment) and 10 (Materials) of Planning permission 19/00225/MMAMD dated 18th April 2019
Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
Burgess Park Community Sports Pavilion Burgess Park Community Sport Ground 106 Cobourg Road London Southwark SE5 0JB
Discharge of Condition 9 details of security measures as required by planning permission dated 07/07/2021 [LBS Ref 21/AP/1002] for Minor material amendment to planning permission 19/AP/1275 (Demolition of existing sports centre and adjacent all-weather pitch and construction of a new single storey sports centre with 2. No. new all weather pitches, associated lighting and hard and soft landscaping including new 'spectator mounds' to west and north of new pitches) for amendments to configurations and setting out of building including an overall increase in building footprint of 118sqm to facilitate an Air Source Heat Pump, relocation of the clubroom within the sports centre to the south, amended external cladding from silver aluminium to copper, and inclusion of green roof, as well as changes to the landscaping and re-location of cycle parking.
Former Lawrence Automotive Site Sayer Drive Coventry CV5 9PF
Submission of details to discharge condition No. 14 (Noise and Vibration Management Plans); imposed on planning permission reference S73/2022/0165 granted on 06/05/2022 for Variation of Condition 2 (drawing Numbers) on planning permission FUL/2020/2794 for Construction of an industrial unit (General Industrial (Class B2) and/or Storage and Distribution (Class B8) use) with ancillary offices, access, servicing, parking, drainage and landscaping. Construction of HGV trailer parking for adjacent unit (Class B8) with pre-check offices, lighting, drainage and landscaping; and all other ancillary works approved on 12/11/2021 - to amend height of building, addition of a door to gatehouse, and relocation of HGV turning circle, erection of single storey plant room with plant on the roof, installation of first floor mezzanine, HVAC installation, additional windows, installation of silos, water treatment plant, smoking shelter, new automatic barrier and other external alterations.
Immingham Railfreight Terminal Scandinavian Way Stallingborough Grimsby North East Lincolnshire DN41 8DT
Details in discharge application of conditions 5 (Materials), 6 (drainage), 7 (Construction Management Plan), 8 (piling), 9 (landscaping), 15 (management), 18 (Contamination), 19 (Contamination 2), 20 (Contamination 3), 21 (Contamination 4), 23 (Stack Light), 24 (MOD Notification) pursuant to DM/0274/20/FUL (Variation of condition 2 (Approved Plans) pursuant to DM/0628/18/FUL (Partially demolish existing building and erect 20MWE waste to energy power generation facility, 65m stack and associated plant, machinery, parking and external works) to increase bunker and boiler room height to 40m to the ridge, amend roof design to a mono-pitch, amend roof design of boiler room to pitch roof, erect raised platform of 3.8m high for fuel delivery, repositioning of attenuation basin and handing of the building by 180 degrees) AMENDED INFORMATION DEC 2020
Hammersmith Town Hall King Street London W6 9JU
Non-Material amendment to approved application 2018/01500/FUL to amend the triggers for Conditions 32 (Ventilation Strategy) to enable below ground works ahead of formal discharge of these details. Changes to the triggers to Conditions 49 (Materials), 50 (Detailed Drawings) to enable construction to structural steelwork to the Town Hall and Town Hall roof extension ahead of formal discharge of these details. Changes to the trigger of Condition 51 (Landscaping and Public Realm) to refer to phasing plan. Amendments to the wording of Condition 11 (Archaeology) and Condition 67 (Airwaves Interference Study) to reflect the details already discharged and to clarify the remaining requirements.
Reydon Grove Farm Rissemere Lane East Reydon Southwold Suffolk IP18 6SN
Discharge of Conditions Nos. 4 and 8 of DC/13/2545/VOC - Variation of Condition 2 of DC/12/0029/FUL - Construction of a replacement dwelling. Minor material amendment including alteration to some window and door design, removal of louvred shutters, material change of soffit from metal to timber, roof material change to sarnafil, slight dome to roof and removal of sides of garage and slight change to its footprint. Information received required by condition nos. 4, 6, 7 & 9 - 11- hard and soft landscaping details, confirmation that stable building has been demolished, details of wall facing/roof materials and contamination report.
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.
Former Southwark Town Hall 31 Peckham Road London SE5 8UB
Full discharge of Condition 14 'BREEAM Post Construction Review Certificate for the Student Accommodation' attached to planning permission 13/AP/2979 [dated 31.01.2014] for: "Demolition of buildings to the rear of the Town Hall including Theatre Peckham to facilitate redevelopment of the site. Erection of a part 7, part 4 storey building and refurbishment of the Town Hall to provide student accommodation (155 rooms), a new Theatre (1,192 sq metres), professional artist studios (Use Class B1a-c) and a cafe (Class A3). Construction of a one storey structure as a roof extension to the Town Hall and new building for use as a student common room with associated roof terrace. Creation of a new public space at the rear of the site, linked to the new entrance to Theatre Peckham, with associated landscaping works" (Note: this is the development description as approved by non-material amendment application 14/AP/2779).
Former Southwark Town Hall 31 Peckham Road London SE5 8UB
Full discharge of Condition 15 'BREEAM Post Construction Review Certificate for the Theatre' attached to planning permission 13/AP/2979 [dated 31.01.2014] for: "Demolition of buildings to the rear of the Town Hall including Theatre Peckham to facilitate redevelopment of the site. Erection of a part 7, part 4 storey building and refurbishment of the Town Hall to provide student accommodation (155 rooms), a new Theatre (1,192 sq metres), professional artist studios (Use Class B1a-c) and a cafe (Class A3). Construction of a one storey structure as a roof extension to the Town Hall and new building for use as a student common room with associated roof terrace. Creation of a new public space at the rear of the site, linked to the new entrance to Theatre Peckham, with associated landscaping works" (Note: this is the development description as approved by non-material amendment application 14/AP/2779).