Land Bounded By Villiers Road & Penrhyn Road Knowsley Business Park Knowsley
NON MATERIAL AMENDMENT FOLLOWING THE GRANT OF PLANNING PERMISSION 22/00163/FUL (ERECTION OF A INDUSTRIAL/COMMERCIAL BUILDING (USE CLASSES B2/B8 AND E (g) (iii) ) INCLUDING MEZZANINE ANCILLARY OFFICE SPACE TOGETHER WITH THE CONSTRUCTION OF 2 NO. NEW VEHICULAR ACCESSES TO VILLIERS ROAD, SERVICE YARDS, CAR/CYCLE PARKING, LANDSCAPING AND OTHER ASSOCIATED WORKS) AMENDMENTS SOUGHT TO APPROVED PLANS FOR ERECTION OF CONDENSER COMPOUND, LOUVRES ADDED TO OFFICE ELEVATION, BAT BOXES ADDED TO NORTH ELEVATION, PV PANELS REVISED, ROOF HATCH AND ROOF LANDING PLATFORM ADDED, VEHICLE ENTRANCES REVISED, LINE OF SECURITY FENCE AMENDED, DISABLED PARKING BAYS & MOTOR CYCLE SPACE RELOCATED, PERSONNEL ESCAPE STAIRS RECONFIGURED.
Sewage Disposal Works 30 Doman Road Camberley Surrey GU15 3DF
Application for non material amendment to planning permission 19/0420 as amended by 21/1119//NMA to allow for the erection of two smoking shelters in the rear service yard, the construction of an access ramp across the existing drainage channel, omission of small section of fencing to allow for maintenance access, omission of three parking bays in the rear service yard, provision of two refuse enclosures in the rear service yard, replacement of entrance swing gates with sliding gates and reconfiguration of the pedestrian footpath, installation of additional photovoltaic panels on warehouse roof and amendments to the pedestrian access ramps to the office element
Land South Of Field Lane South Elmsall Pontefract WF9 2SX
Non Material Amendment to Planning Permission ref. 19/02495/FUL dated 06/11/2020 'Construction of a warehouse and distribution centre' amendments comprise (a) reconfiguration/ re-location of: (i) car and cycle park and turning head, (ii) road spur, (iii) pedestrian and cycle pathways, (iv) staff amenity area, (v) conveyor bridge & stair towers, (vi) PV invertor plant, (vii) sprinkler tanks, (viii) access gate to northern yard, (ix) main site access pedestrian and vehicular access gates and associated filter lanes and (x) pump-house; (b) removal of: (i) pedestrian link bridge to west; (c) introduction of: (i) additional maintenance access doors, (ii) 4 sub-stations, (iii) northern-power-grid unit, (iv) 2 bailers to eastern elevation, (v) additional stair towers to southern and eastern elevations, (vi) vehicle protection barriers, (vii) amenity roof terrace and (viii) 5 rapid EV charging points; (d) extension of: (i) workshop block to eastern elevation, (ii) office and welfare block to north-western corner and (iii) secure perimeter fencing along the southern section of the access road; (e) substitution of: (i) aluminium feature frame with flat opus plank cladding system; (f) reduction in (i) HGV parking from 150 spaces to 131 spaces and (ii) accessible parking from 34 spaces to 29 spaces.