Canada Water Masterplan: Land Bound By Lower Road (West), Redriff Road (South), Quebec Way (East), Surrey Quays Road London Southwark
Non material amendment to ref. 21/AP/4712: Details of all reserved matters relating to Development Zone F of the Canada Water Masterplan, comprising a residential-led (Class C3) building and a combined office (Class B1) and residential (Class C3) building, both of which would include flexible retail/workspace (Classes A1-A4 and B1) at ground floor level alongside disabled car parking, cycle parking, servicing, landscaping, public realm, plant, a single-storey basement Amendments sought are: - Introduction of an additional stair within both residential towers to align with the recent changes to fire regulations - Alterations to internal layouts of the residential accommodation as a result of the introduction of a new stair in each tower. - Introduction of comfort cooling to respond to the new Building Regulations Part O 2021 relating to overheating. - Minor design amendments to the top of the residential towers. - Amendments to the facade design to respond to the new Building Regulations Part L 2021 relating to energy performance - Creation of a new cycle entrance at ground floor serving the commercial building. - Alterations to accommodate an additional escape at ground floor as a result of the introduction of a new stair in each tower as well as associated ground floor louvre requirements. - Changes to the communal amenity space on the fourth floor level of tower F1, including the introduction of an external garden room, increasing the shared external amenity provision. - Minor changes to the public realm design at ground floor level. - The proposal will result in a small decrease in floor area (562 sqm GIA / 440 sqm GEA). - The application will result in one additional residential unit and an amended unit mix (411 units comprising 27 studios, 135 x 1b2p, 178 x 2b3p, 29 x 2b4p and 42 x 3b6p) - As a result of this NMA Conditions 1, 11 and 14 of the original permission will be reworded
Madford Retail Park Ware Road Hertford Hertfordshire
Non-material amendment to planning approval 3/89/0094/OP (originally dated 13.09.1989) as subsequently varied by way of applications 3/00/1650/FO (dated 21.12.2000) and 3/00/0520/FP (dated 04.07.2000) to amend the wording of the description of development to remove the words "non food". The resulting description of the development would read as factory and offices for ADDIS Ltd (30,600 sq ft). Retail Development (68,000 sq ft).
Graphite Square London SE11 5EE
Application for a Non-Material Amendment following a grant of Planning Permission ref: 17/02936/FUL (Demolition of existing office, warehouse and church buildings (use classes B1, B8, and D1), and redevelopment of the site to provide a residential led mixed-use development with a podium building of ground plus 3 storeys (fronting onto Worgan Street) connecting a ground plus 9 storey building (fronting onto Worgan Street), a ground plus 13 storey building (fronting onto Worgan Street), and ground plus 13 storey building (at the junction of Worgan Street and Jonathan Street) to provide 160 residential units, offices (use class B1), a ground-floor flexible retail/café/office (flexible use class A1/A3/B1), a replacement Methodist church (use class D1), and provision of a single level basement, together with servicing, car and cycle parking, and provision of new public realm and associated works.) granted on 12.03.2018.
133 Park Street And 105 Sumner Street London SE1 9EA And SE1 9HZ Southwark
Non-material amendment to condition 1 (approved plans) of planning permission 19/AP/5664 'Minor material amendment to planning permission 16/AP/4569 for the demolition of existing buildings and redevelopment to provide two Class B1 office buildings of nine storeys and ten storeys plus plant. The development will include the creation of a new basement; new public realm; provision of a retail (Class A1/A3/A5) kiosk; hard and soft landscaping and other associated works. The proposed amendments include: Reduction in the size of the basement; Consolidation of basement to Block A; relocation of plant; Provision of a cycle ramp; Minor amendments to the massing of Block A and B; Minor re-positioning of Block B; Façade and design amendments to both Block A and B Increase of above ground floorspace of 1,130sqm (GIA)'. Non-material amendment to update three plans to correct drafting errors and reflect changes in land ownership.
The Straight Southall UB1 1QX
Details of a remediation validation/verification report in part pursuant to condition 38 (Phase 3 only) of planning permission ref: 171562VAR dated 16.10.2017 for "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the
Part Of The South Acton Estate Acton London W3 8RF
Submission of a construction management plan in pursuant to condition 8 (Central Plaza element only) of planning permission ref: 160794VAR dated 09/12/2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
The Straight Southall Middlesex UB1 1QX
Details of external noise in part pursuant to condition 79 (Phase 3 only) of planning application Ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle..........'
208 - 212 High Street Orpington BR6 0JN
Non-material amendment to planning permission ref: 21/03145/FULL1 granted for the Demolition of existing building and erection of a part three, four and five storey building consisting of ground floor commercial retail and office/workshop floorspace (Class E), with 40 residential units (10 x one bed, 28 x two bed and 2 x three bed), together with ground level communal space, cycle parking, 2 x disabled off-street parking spaces at the rear (accessed via Vinson Close), communal gardens/landscaping and all associated ancillary development in order to amend the description to the following: 'Demolition of existing building and erection of a part three, four and five storey building consisting of ground floor commercial retail and office/workshop floorspace (Class E), with 41 residential units, cycle parking, 2 x disabled off-street parking spaces at the rear (accessed via Vinson Close), communal gardens/landscaping and all associated ancillary development.'
Shell Centre 2 - 4 York Road London SE1 7ND
Application for a non-material amendment following a grant of planning permission ref: 12/04708/FUL (Part demolition of Shell Centre comprising Hungerford, York and Chicheley wings, upper level walkway, removal of raised podium deck, associated structures and associated site clearance to enable a mixed use development of 8 buildings ranging from 5 to 37 storeys in height and 4 basement levels to provide up to 218,147m2 of floorspace (GIA), comprising offices (B1), residential (C3) (up to 877 units), retail (A1-A5), leisure (D2) and community/leisure uses (D1/D2), parking and servicing space, hard and soft landscaping together with the provision of a new public square, highway and landscaping works to Belvedere Road, Chicheley Street and York Road, modifications to York Road Underground station, 2 link bridges from new buildings to the existing Shell Centre Tower, reconfiguration of York Road footbridge if retained, creation of new vehicular access and other associated works) granted on 06.06.2014. Amendment sought: The proposed non-material amendments relate to Levels 12 and 13 of Building 5 and comprise: -changes to the accommodation provision to increase the north most penthouse from 3 bedrooms to 4 bedrooms; -an amendment to the northwest corner facade line to bring forward the line of the curtain walling on the northwest penthouse; -the addition of a new openable vent on the west facade; and -the redistribution of several back painted glass panels on the east facade.