Land At And Adjacent To Hulton Park Bolton
PART A: FULL PLANNING APPLICATION FOR RESTORATION WORKS TO HULTON PARK AND EXISTING STRUCTURES & HERITAGE ASSETS WITHIN IT, INCLUDING THE PLEASURE GROUNDS, DOVECOTE, WALLED GARDEN AND LAKES, THE DEMOLITION OF VARIOUSE EXISTING BUILDINGS AND STRUCTURES; THE DEVELOPMENT OF A GOLF RESORT, INCLUDING AN 18-HOLE CHAMPIONSHIP-GRADE GOLF COURSE, CLUBHOUSE, GOLF ACADEMY (COMPROSING DRIVING RANGE, PRACTICE COURSE, ADVENTURE COURSE & ACADEMY BUILDING WITH SPORTS & LEARNING FACILITIES, A GOLF SHOP & CAFE); A HOTEL WITH ADJOINING SPA & CONFERENCE FACILITY, AND OTHER ANCILLARY BUILDINGS, STRUCTURES & ENGINEERING & LANDSCAPE WORKS INCLUDING A MAINTENANCE BUILDING, HIGHWAY ACCESSES, INTERNAL ACCESS ROADS, HIGHWAY UNDERPASS, VARIOUS BRIDGES, BOUNDARY TREATMENTS, EXTERNAL LIGHTING, PARKING, NEW AND REPLACEMENT AND OPEN SPACE; HIGHWAYS INFRASTRUCTURE; AND, WERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF PUBLIC RIGHTS OF WAY NETWORK AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS. PART B: OUTLINE PLANNING APPLICATION FOR THE RESIDENTIAL DEVELOPMENT OF UP TO 1,036 DWELLINGS, A LOCAL CENTRE; VILLAGE HALL; COMMUNITY ALLOTMENTS; PRIMARY SCHOOL; SHOT STAY HOLIDAY ACCONNODATION, COMPRISING THE CONVERSION OF HOME FARM COTTAGE AND THE CONSTRUCTION OF MEWS BUILDING, CABINS AND LODGES; AND A RANGE OF OTHER RETAIL, LEISURE, RECREATION, COMMUNITY AND FOOD AND DRINK-RELATED USES; HIGHEAYS INFREASTRUCTURE; THE REGRADING OF LAND TO ACCOMMODATE THE GOLF COURSE AND STAGING AND SUBSEQUENT REGRADING FOR RESIDENTIAL DEVELOPMENT; AND, WHERE APPLICABLE, THE RE-ROUTING, UPGRADING AND EXTENSION OF THE PUBLIC RIGHTS OF WAY NETWORK, AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS, WITH ALL MATTERS RESERVED EXCEPT FOR (IN PART) ACCESS, AND IN RESPECT OF SHORT STAY HOLIDAY ACCOMMODATION, LAYOUT
Land East Of Topcliffe Road And South Of Gravel Hole Lane Topcliffe Road Sowerby North Yorkshire
Discharge of Conditions 6 (Materials), 7 (Boundary Treatment Details), 8 (Boundary Treatment Construction), 9 (Landscaping), 10 (Habitat Creation), 11 (Levels), 13 (Noise Mitigation), 15 (Noise Control), 16 (Land Contamination), 19 (Lighting Scheme), 20 (Railway Assets), 21 (Archaeology), 22 (Energy Saving), 23 (Control of Dust/Emissions), 24 (Secured by Design), 25 (Ecological Mitigation), 26 (Wintering Bird Survey), 28 (Habitat Creation and Management), 29 (Highways Drawings), 31 (Movement of Vehicles), 33 (Visibility Splays), 36 (Construction Phase Management Plan), 40 (Prevention of Detritus on Highway) and 42 (Site Compound and Parking) attached to Planning Consent 15/00145/MRC. Outline application for a mixed use development comprising of 925 dwellings (C3), employment (B1, B2 & B8), neighbourhood centre, comprising: shops (A1), financial and professional services (A2), restaurant(s) and cafe(s) (A3), drinking establishment(s) (A4), hot food takeaway(s) (A5), hotel (C1), extra-care facility (C2) and medical centre and other non-residential institutions (D1), primary school (D1), community uses including recreation playing pitches and allotments, car parking and means of access (all matters reserved apart from means of access). Phase I residential 107 dwellings & Phase I commercial (B1c) all details to be considered as amended by plans received by Hambleton District Council on 20th September 2011 and 7th October 2011