116-118 Warley Hill Warley Brentwood Essex CM14 5HB
Discharge of Conditions 3 (Details of Materials), 4 (Details of Cycle Storage), 6 (Details of Refuse Storage), 8 (Electric Car Charging Points), 9 (Details of Efficiency Measures) and 10 (Construction Management Plan) of application 23/00147/FUL (Change of use of ground floor from office to residential to create two additional flats to include construction of single storey rear extension, construction of 2 bay windows to front with pitched roof over and a front boundary wall with railings).
116-118 Warley Hill Warley Brentwood Essex CM14 5HB
Change of use of ground floor from office to residential to create two additional flats to include construction of single storey rear extension, construction of 2 bay windows to front with pitched roof over and a front boundary wall with railings.
19 Leigham Avenue London Lambeth SW16 2PT
Approval of details pursuant to conditions 9 (basement method statement and flood risk assessment) and 10 (construction methodology) of planning permission 19/02024/FUL (Change of use and conversion of the existing building involving demolition of the rear building, excavation to create a basement with lightwells, erection of dormer windows in the rear elevation in connection with conversion of existing loft to habitable floorspace and the erection of 2 storey rear extension (new building) and a 2 storey side extension with undercroft to provide 400sqm of Office floorspace (Use Class B1(a)) at basement and ground floor levels and 8 residential units (Use Class C3) at part ground floor and on the upper floors together with the provision of 2 parking spaces, cycle/refuse stores and new boundary treatments) granted on 19.03.2020.
Kings Arms The Street Lockerley Romsey Hampshire SO51 0JF
Change of use to residential, change of use of apartment to office space, alterations to fenestration, installation of roof lights, rationalisation of parking, construction of boundary wall (Retrospective)
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)