Marles Hill 150 Wheatley Lane Road Barrowford Nelson Lancashire BB9 6QQ
Approval of Details Reserved by Conditions: Discharge of Condition 1 (Reserved Matters timescale), Condition 2 (Appearance & Landscaping - Reserved Matters), Condition 3 (Approved Plans), Condition 4 (Foul & Surface Water), Condition 5 (Ecological Appraisal), Condition 6 (Tree Protection Fencing), Condition 7 (Trees to be removed), Condition 8 (Wheel washing), Condition 9 (Boundary Treatment Height) and Condition 10 (Demolition) of Planning Permission 17/0120/OUT
Marles Hill 150 Wheatley Lane Road Barrowford Nelson Lancashire BB9 6QQ
Approval of Details Reserved by Conditions: Discharge of Condition 1 (Reserved Matters timescale), Condition 2 (Appearance & Landscaping - Reserved Matters), Condition 3 (Approved Plans), Condition 4 (Foul & Surface Water), Condition 5 (Ecological Appraisal), Condition 6 (Tree Protection Fencing), Condition 7 (Trees to be removed), Condition 8 (Wheel washing), Condition 9 (Boundary Treatment Height) and Condition 10 (Demolition) of Planning Permission 17/0120/OUT
22A Lavant Road Chichester West Sussex PO19 5RG
Discharge of Conditions 3 (CEMP) , 4 (tree protective fencing details), 5 (tree ground protection measures), 6 (surface water drainage scheme) , 7 (asbestos survey) , 8 (soft landscaping scheme), 9 (hard landscaping scheme) and 16 (boundary treatments) of planning permission CC/20/01897/FUL. DOC SUMMARY FIGURES 1 TO 3 ARBTECH AMS ARBTECH TPP03 CONSTRUCTION ARBTECH TPP03 DEMOLITION C2063 FW AND SW DRAINAGE REPORT SI 1872 ASBESTOS REPORT
Land To The East Of The Junction With School Street Station Road Mosborough Sheffield S20 5AD
Application to approve details relating to conditions 3. 4. and 5. contaminated land investigation, 6. demolition of Dutch Barn, 7. protected species surveys, 8. Woodland and Ecology Management Plan, 9. fencing, 10. tree protection, 11. fencing to kilns, 12. construction vehicle access, 13. Archaeolgical site investigation, 14. Coal site investigation report, 15. surface water, 16. renewable energy, 17. Brow Improvements, 18. wheel cleaning, 19. details external materials, 20. landscaping, 21. bat detector surveys, 22. remediation strategy, 26. boundary treatments, 27. surface water discharge and 28. vegetation clearance imposed by 19/01394/FUL
77 Shenfield Place Shenfield Brentwood Essex CM15 9AJ
Discharge of conditions 3 (Details of materials), 4 (Details of boundary treatments), 5 (Scheme of soft and hard landscaping), 6 (Details of finished site levels and floor levels), 7 (Details of tree protective fencing), 8 (Arboricultural Method Statement), and 9 (Construction Method Statement) of application 20/00816/FUL (Demolition of the existing property and the construction of one replacement dwelling and one additional dwelling).