Former Birds Eye Site Ladysmith Road Grimsby North East Lincolnshire
Reserved matters pursuant to DM/0675/15/LDO for a mixed use development comprising 184 houses, 76 apartments and 1000m2 of commercial floor space with appearance, access, layout, scale and landscaping to be considered. Along with details to discharge Condition 7 (Construction Management Plan), Condition 8 (Access Details) and Condition 12 (Foul and Surface Water Drainage) - original amendments include layout and boundary changes and reconfiguration of properties facing Ladysmith Road. Further amendments include changing some 2 bed units to 3 beds with inclusion of dormers within roof (to plots 57, 62, 68, 69, 73, 74, 79, 81, 85, 86, 87, 89, 92, 95, 96, 101, 106, 107, 110, 111, 117, 118, 121 of phase 2 and 128, 130, 133, 134, 138, 142, 143, 148, 149, 152, 154, 158, 159, 162, 163, 164, 169, 173 of phase 3 and 176, 177, 178 and 183 of phase 4) with amendments (May 2019) including rear projections of 900mm to plot 42 in phase 1 and to all plots within phase 2 onwards (except blocks A and B) and (Oct 2021) including increase in dwelling sizes of plots 84-123 (phase 2), 124-174 (phase 3) and 175-184 (phase 4) and (Jan 2022) a reconfiguration in the layout, design and position of Apartment Block B (phase 4)
Phase B Meggitt Site Beake Avenue / Holbrook Lane Coventry
Submission of details to discharge conditions 11 (Boundary Treatment Details), 17 (Hard and Soft Landscaping Works) and 18 (Facing and Roofing Details) imposed on planning permission reference FM/2020/0668 granted on 28/05/2021 for 'Demolition of existing factory buildings and development of 499 dwellings, including affordable homes, in a mix of single, 2, 3 and 4 storey buildings, development of 254,676sq. ft of employment floorspace falling within Classes B1 and B8, retention of primary substation, removal of existing access and erection of new access to Holbrook Lane, realignment and reopening of Swallow Road to public use, all associated internal roads, service areas and parking, erection of noise barrier, new open space and landscaping, new drainage including sustainable drainage features, retention of sports pitches and retention of Sports and Social club facilities.'