Sutherland House, Vauxhall House And Connaught House Upper Vauxhall Wolverhampton West Midlands
Proposed development works to three existing blocks of flats. The proposals include new External Wall Insulation (EWI), new balconies, new windows and external doors, refurbishment of the communal areas, new car parking, demolition of the existing balconies and construction of new ones, new sprinklers and a new sprinkler tank house, demolition of the existing entrances and construction of new entrance lobbies, the extension of the roof parapets, a new district heating system and energy centre, upgrade of the smoke ventilation system and building fire safety, replacement of the core services (power/ cold water), new SUDs and associated landscaping works.
Land Rear Of 10 New Road Gosfield Essex
Variation of Condition 1 (approved Plans) of permission 22/02762/VAR granted 5/12/2022 for: Variation of Condition 1 (Approved Plans) of permission 20/00500/REM granted 05/05/2021 for Application for approval of Reserved Matters (appearance and landscaping) of outline planning consent 17/00119/OUT - Demolition of existing buildings and hardstanding and construction of 8 no new dwellings together with new vehicular access onto New Road and associated development. Variation would allow:-Amendment to house types Plots 1 & 4 -Add rear dormer & change rear Juliet balcony to windows. Plots 2 -Addition of third rooflight in rear elevation. Plot 6- Insertion of 2 side elevation windows. Plots 6 & 8- Change render to cement board cladding and All plots - Addition of PV solar panels to southfacing roof slopes of approved house types.
Land Rear Of 10 New Road Gosfield Essex
Variation of Condition 1 (approved Plans) of permission 22/02762/VAR granted 5/12/2022 for: Variation of Condition 1 (Approved Plans) of permission 20/00500/REM granted 05/05/2021 for Application for approval of Reserved Matters (appearance and landscaping) of outline planning consent 17/00119/OUT - Demolition of existing buildings and hardstanding and construction of 8 no new dwellings together with new vehicular access onto New Road and associated development Variation would allow amendment to house types Plots 1 & 4 - Addition of rear dormer, reduction of heavy front gable and internal alterations; Plot 2 - Additional front dormer; Plots 2, 5, 6 & 8 - Removal of external chimney stacks but retain stacks above roof lines to plots 2 and 5, and replacement of render with cement board cladding to plots 6 and 8; and All plots - Addition of PV solar panels to southfacing roof slopes of approved house types
Queen Alexandra Hospital Southwick Hill Road Portsmouth PO6 3LY
Development in four locations to accommodate new electrical supply cables and the associated High Voltage Electrical infrastructure to include: demolition of existing office block adjoining the transport garage and construction of a new building to house electrical switchgear; installation of 2no. generators to the rear of service yard; installation of electrical service infrastructure from ground to roof level on Nightingale Road elevation; installation of a roof-top plant room on north east corner of the main block
Hutton View Care Home Former Brigade Headquarters Rayleigh Close Hutton Essex CM13 1FF
Variation of condtion 3 (approved drawings) and condition 22 (Acoustic Report) of application 17/01527/OUT (Outline application for the construction of a 55 bed assisted living and a 77 bed care home development together with associated communal facilities, access, basement car, cycle and mobility scooter parking, refuse storage area, landscaped grounds and associated works following demolition of existing buildings. (Landscaping reserved matters)) to allow for variation to landscaping plan to incorporate artificial grass to existing Putting Green and New Roof Plan drawing showing Roof Plant Apparatus and revised acoustic report.
81 Picton Street London Southwark SE5 7QH
Non-material amendment of planning permission 21/AP/1535 'Minor material amendment to planning permission 19/AP/5860 (Variation to Condition 1 (Approved Plans) pursuant to planning permission 18/AP/3350 'Redevelopment of the site to include the demolition of the existing building and erection of a part four, part five storey new care home to provide 92 bed spaces with associated landscaping and access works'.) for internal alterations to provide additional communal space resulting in the reduction in the number of bed spaces from 102 to 98, reduction in the number of car parking spaces from 12 to 11 and the addition of a roof plant.' To amend Condition 6 to allow the BREEAM Post Construction Review to be submitted within 6 months of completion of the development rather than before the first occupation of the building.
7 Holbein Place Royal Borough Of Kensington And Chelsea London SW1W 8NR
Proposed development at: Strand House, 7 Holbein Place, LONDON, SW1W 8NR. Description of Development: Demolition of roof structures and fourth floor level and erection of fourth, fifth floor and part sixth floor for office (Class B1) use. Construction of roof terrace and plant enclosure. Replacement of windows and plant. Insertion of green walls. Creation of ground floor entrance. Landscaping works and other associated external works. (MAJOR APPLICATION)
Rootes Maidstone Len House Mill Street Maidstone Kent ME15 6YD
Restoration of Len House and associated new build works to provide a mixed-use development comprising: (i) Retention with alterations and change of use of Len House to provide 3,612 sqm (GIA) flexible commercial floorspace within the following uses - retail, financial and professional, café or restaurant, drinking establishment, offices, clinic or health centre, crèche or day nursery, gymnasium or indoor recreational purposes uses (within classes A1/A2/A3/A4/A5/B1a/D1/D2 of the Town & Country Planning uses Classes Order) at ground floor, 18 No. residential apartments (C3) at first floor level, together with ancillary car parking. (ii) Erection of part rear first floor and two storey roof extension to provide 62 No. new residential apartments, with rooftop amenity space. (iii) Construction of two new buildings of up to 5-storeys to provide 79 No. residential apartments (C3) with amenity space. (iv) Provision of associated car parking, open space, earthworks including demolition of hardstanding and structures, and new boardwalk to north side, de-culverting the River Len and re-utilisation existing vehicular access points from Mill Street and Palace Avenue.