Ladydene Moor Green Ardeley Stevenage Hertfordshire SG2 7AT
Variation of condition 2 (Approved plans) and 3 (Materials specified) of planning approval 3/22/1985/HH - Raising of roof and loft conversion to create first floor, incorporating five dormers and two rooflights. Erection of two storey rear extension with rear gable. Alterations to fenestration. Remodelling of existing conservatory in traditional form with pitched tiled roof. Construction of front porch. Demolition of existing garage and re-build as car port. Extension of driveway- Amendments to the materials, location of Western dormer adjusted, alterations of fenestration.
25 Blomfield Road London W9 1AA
Excavation of basement level beneath footprint of existing house with walk on rooflights; Rebuilding of bathroom extension at lower ground floor; Erection of extension at ground floor level over octagonal wing and creation of new parapet; Erection of infill extension on northeast elevation; Remodelling of bay on southeast elevation at lower ground floor level; Erection of replacement dormer; Demolition of existing retaining walls on south east elevation and eastern lightwell and construction of new metal escape stairs in these location; Replacement of windows; Rationalisation of drainage, repair of stucco render, repair/ refurbishment and part replacement of existing roof, refurbishment/ replacement of existing chimney and pots; Installation of Plant Machinery; Erection of bin and bike store to front garden; and associated external alterations.
Ladydene Moor Green Ardeley Stevenage Hertfordshire SG2 7AT
Raising of roof and loft conversion to create first floor, incorporating five dormers and two rooflights. Erection of two storey rear extension with rear gable. Alterations to fenestration. Remodelling of existing conservatory in traditional form with pitched tiled roof. Construction of front porch. Demolition of existing garage and re-build as car port. Extension of driveway.
Barrs Hill School & Community College Radford Road Coventry CV1 4BU
Submission of details to discharge conditions 5-targeting and utilising local people for construction and employment, 9-Construction Environmental Management Plan, 12-Construction Management Plan: imposed on planning permission FUL/2020/2051 for erection of new build two storey seven classroom teaching block, Internal remodel of existing block A including replacement of windows and doors, erection of new build science laboratory and studio, together with modifications to existing windows and doors to accommodate an internal remodel and refurbishment of Block C, Demolition of external chemical store to accommodate the new science laboratory and studio, Removal of infill brickwork and high level windows to Block A to accommodate new full height windows with associated landscaping granted 23/12/2020