Highlands Maidstone Road Seal Sevenoaks Kent TN15 0EH
Two storey side extension, single storey front entrance porch, alteration to existing first floor roof pitch and installation of 3 x dormer windows with associated external and internal alterations. Conversion of existing garage to living accommodation. Provision of first floor balcony to south elevation and hipped roof to bay window. Demolition of existing outbuildings. Realignment of existing entrance driveway, construction of inset detached garage and associated landscaping and fencing.
Part Of The Green Man Lane Estate Bound By Felix Road Tewkesbury Road Green Man Lane Romsey Road And Green Man Gardens West Ealing W13 0NY
Application for a Non-Material Amendment in (S96a) seeking to allow adjustments to fences and cycle parking in relation to planning permission reference P/2015/0072 dated 19/11/2015 for 'Demolition of all buildings and structures within the site (including Jubilee Hall, Green Man Lane Estate Community Centre, St John's First and Middle School, and 88-134 Tintern Court (North) and blocks comprising 18-21, 22-24, 42-45 and 51-53 Tintern Court, part of 15-17 Tintern Court, part of 36-41 Tintern Court, and part of 46 & 47 Tintern Court) and the phased construction of 92 residential units (26 x one-bedroom, 40 x two-bedroom, 3 x three-bedroom flats, and 20 x three-bedroom houses and 3 x four-bedroom houses in a mix of housing tenures) in apartment buildings varying between three-storeys and six-storeys high and including a row of 23 two-storey terraced houses (with accommodation in the roof) and associated refuse / recycling and bicycle storage facilities; community floorspace at ground floor level of the apartment buildings comprising 766sq.m floorspace (flexible D1 / D2 Use Class); a nursery and three-form entry primary school accommodated in buildings varying between two-storeys and three-storeys high with 3,937sq.m floorspace (D1 Use Class), together with associated playspace and a multi-use games area; alterations to the adopted highways (including Felix Road, Romsey Road and Green Man Lane) incorporating the setting-out of 70 car parking spaces and re-provided footways; site-wide hard and soft landscaping; and other associated infrastructure'
Broad Oak Farm Sweechgate Broad Oak Sturry CT2 0QR
Non-material amendment to planning permission CA/18/00868/FUL for the hybrid planning application comprising: detailed/full application for development of 456 residential dwellings comprising 402 houses and 54 flats, with associated open space, landscaping, car parking, access and other infrastructure (following demolition of 52 Shalloak Road, existing agricultural buildings and structures); and outline application (with all matters reserved) for development of a commercial area with up to 212sqm of Class A1 and up to 593sqm of Class B1 use; to allow fences to plots 336-338, footprint to flat blocks 348-395 and 366-377 updated, removal of screen wall to flat parking court entrances, materials to include product names and housing types amended from Dewhurst to Nuthurst, change of roof tile spec to monbond mini stonewold, closeboard fences to panel fencing and curved screen walls to chamfer, boundary treatments to show screenwalls to closeboard fence plots 28, 31, 75, 79, 103-108, 109-115, 165, 167 and 172, hardstanding added to plots 188 and 194, block paving to plots 408 and 412 extended, road surfaces and raised tables updated, plot 178 garage relocated, plots 162 and 163 compliance M4(2) removed and 71 and 269 M4(2) compliance added and parking, plots 150-151 and 155-156 carports combined, plot 150 relocated to north, Fairway plots 67-67,216-217,242-243 and 258-259 handed, driveway surface reduced to plots 25,179,194,203-204,233,309-312,326-327,330 and 335, grass verge added opposite 221-225, Layton type; roof construction, rainwater pipes, standardise tile hanging to Earleswood and Hereford and rainwater pipes revised, flat blocks; side doors omitted, window depth reduced to bathrooms, full brick cills indicated, inclusion of lift shaft, Barratt type; 73 fogs revised ground floor layouts, lutterworth front entrance canopy enlarged, Chester stone sills omitted and replaced with brick, updated carports to plots 155-156 and 4 bay carport omitted.
The White House Waterside Radlett Hertfordshire WD7 7DY
Demolition of existing entrance porch and construction of replacement entrance porch, demolition of existing garage, gym and part demolition of single storey utility wing and construction of replacement double garage and cinema room extension, single storey rear extension with roof terrace over, reinstatement of window opening to existing lounge, two storey side extension with window and flat roof over, and landscape works to include new boundary gates, fence and driveway.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
22 Hamilton Road Hunton Bridge Kings Langley Hertfordshire WD4 8PZ
Outline application: Demolition of existing dwelling and construction of 2no. two-storey detached residential dwellings with loft accommodation including rear dormers and front roof lights; boundary treatment including fencing and brick piers; creation of new bin stores with associated access, parking and landscaping works (scale as a reserved matter)
Part Of The Green Man Lane Estate (Including Part Of Tintern Court And The Green Man Lane Estate Community Centre) Jubilee Hall And St Johns First And Middle School, Bound By Felix Road, Tewkesbury Road Green Man Lane, Romsey Road And Gr
Details of hard and soft landscaping works, boundary treatments and details of Secured by Design fences and gates pursuant to condition 9 of planning permission ref: P/2015/0072 dated 19/11/2015 for Demolition of all buildings and structures within the site (including Jubilee Hall, Green Man Lane Estate Community Centre, St John's First and Middle School, and 88-134 Tintern Court (North) and blocks comprising 18-21, 22-24, 42-45 and 51-53 Tintern Court, part of 15-17 Tintern Court, part of 36-41 Tintern Court, and part of 46 & 47 Tintern Court) and the phased construction of 92 residential units (26 x one-bedroom, 40 x two-bedroom, 3 x three-bedroom flats, and 20 x three-bedroom houses and 3 x four-bedroom houses in a mix of housing tenures) in apartment buildings varying between three-storeys and six-storeys high and including a row of 23 two-storey terraced houses (with accommodation in the roof) and associated refuse / recycling and bicycle storage facilities; community floorspace at ground floor level of the apartment buildings comprising 766sq.m floorspace (flexible D1 / D2 Use Class); a nursery and three-form entry primary school accommodated in buildings varying between two-storeys and three-storeys high with 3,937sq.m floorspace (D1 Use Class), together with associated playspace and a multi-use games area; alterations to the adopted highways (including Felix Road, Romsey Road and Green Man Lane) incorporating the setting-out of 70 car parking spaces and re-provided footways; site-wide hard and soft landscaping; and other associated infrastructure works.
Onion Farm Warburton Lane Warburton WA13 9TW
Application to vary condition 2 (approved plans), 4 (biodiversity enhancement), 5 (materials), 6 (detailed drawing), 8 (landscaping), 10 (site levels), 11 (nesting birds), 12 (detailed drainage scheme), 13 (SUDs), 14 (foul and surface water), 16 (porous parking surface), 17 (door and window details) and 18 (archaeological investigations) from planning permission 94048/FUL/18 (Demolition of existing Dutch barn and the construction of a double garage to form a farmyard/forecourt to Onion Farm. Erection of a cottage outside the curtilage of Onion Farm, existing pigsty to be converted to a refuse store with the installation of new fencing to enclose the site). Amendments including to external elevations incorporating repositioning and redesign of windows and doors, addition of roof lights and amendments to approved internal layout, together with submission of additional information to allow for planning permission to be subject to amended conditions stating the works shall be in accordance with the approved submitted information.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
22 The Park London NW11 7SU
Single storey rear extension following demolition of existing single storey lean-to. Construction of a single storey outbuilding with flat roof for use as home office following demolition of Garage 01. Conversion and refurbishment of existing Garage 02 outbuilding into a workshop / games room with enlarged openings, new doors/ windows and new pitched roof. Landscaping works including changes to levels and creation of a lower patio. New timber decking and fencing.