44 Stradella Road London Southwark SE24 9HA
Construction of front driveway including part-demolition of garden wall. Erection of side rear single storey ground floor extension with green roof. Extension of rear garden paved area. Provision of bike shed and access door in property side passage. Widening of existing window dormer at loft level. Insertion of 2No roof lights 1No to outrigger roof 1No to main roof. Replacement of all existing fenestration (windows/doors) with double glazed timber framed units. Removal of arboriculture features and landscaping works to facilitate the development.
5 Bishopscote Road Luton LU3 1NX
Development of land for mixed use development - Erection of two storey side and single storey rear extension and rear dormer to extend existing shop and create additional flat - Discharge of Condition Nos. 5 (Landscaping), 6 (Electric Charging Point), 8 (Surfacing & Drainage of Parking Areas), 9 (Cycles and Bins Storage), 10 (Desktop Study), 14 (Boundary Treatment), 15 (Management Plan) and 17 (Construction Method Statement) of Planning Permission No. 22/01224/OUT dated 12th December 2022.
21-24 William Brown Court Norwood Road London SE27 9DD
Variation wording of Condition 9 (Secure by Design standards) of planning permission ref : 17/04526/VOC (Variation of Conditions 2 (Approved Plans), 3 (Materials), 5 (Landscaping), 7 (Cycle Storage), 10 (Security Measures), 13 (Wheelchair Accessibility) & 14 (Method of Demolition and Construction Statement); and removal of Condition 11 (Code for Sustainable Homes), of planning approval ref. 15/00233/FUL (Erection of ground floor rear extensions to nos. 21 - 24 William Brown Court, and erection of a first and second floor to provide 8 additional residential units.) Granted on 20.03.2015) granted on 27/11/2017. Variation sought: 9. The development within the red line boundary shall be constructed, maintained and operated thereafter to 'Secured by Design' standards. Reason: To ensure that satisfactory attention is given to security and community safety in accordance with the Local Plan (2015).
Hollesley House Alderton Road Hollesley Suffolk IP12 3RH
Variation of Condition No. 2 of DC/21/1795/FUL - Demolition of a number of flat roofed extensions, construction of three single storey extensions and one two storey extension, Thermally upgrade the existing property externally (clad with timber and render), erection of a traditional 3 bay cart lodge, replacement of existing windows and undertake a modest landscape scheme - The Cart Lodge design has been amended to allow for a plant room, and the overall location relative to the main house has changed slightly. Therefore, condition 2 needs to change to allow for the amended drawing A02-07 A and the revised Cart Lodge plans and elevations A02-08 A - 2. The development hereby permitted shall not be carried out other than in accordance with Site Plan A01-01, drawings A02-05 and A02-06, and Design and Access Statement received 13th April 2021 and A02-07 A and A02-08 A received 7th March 2022.
Snibston Discovery Park Ashby Road Coalville LE67 3LN
Residential development of up to 144 dwellings and erection of an extension to existing theatre to provide a cafe/visitor centre/rangers' office, installation of a play area, public realm works, landscaping and car parks approved under planning permission ref. 17/01424/FULM without complying with Condition nos. 5, 10 and 15 so as to allow for provision of a bin store, additional and amended car parking, installation of automatic car park barriers, construction of a car port for charging of electric vehicles and amended landscaping
Plot BC-01 And Building BC-6 Tower Bridge Business Complex 100 Clements Road Aka The Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Details of Condition 16 - a detailed Construction Logistics and Management Plan (CLMP) for Building BC-6 (Compass School) only (partial discharge) required by planning permission 17/AP/4088 for 'Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed use scheme providing up to 1,418 residential units, up to 3,436 sqm GEA of flexible Class A1/A3/A4 floorspace, up to 14,666 sqm GEA of flexible Class B1 floorspace, up to 869 sqm GEA of flexible Class D1/D2 and up to 3,311 sqm GEA of multi use floorspace (A1/A3/A4/D1) within Building BF-F, a new secondary school, in buildings ranging from 6 to 36 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, childrens' playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and other associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme providing up to 130 residential units and up to 780 sqm GEA of flexible A1/A3/A4/D1/Sui Generis Uses and other associated works'.
Plot BC-01, Building BC-6 Tower Bridge Business Complex 100 Clements Road Aka The Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Details of Condition 8b - a written construction environmental management plan (CEMP) for Building BC-6 as required by planning permission 17/AP/4088 for 'Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed use scheme providing up to 1,418 residential units, up to 3,436 sqm GEA of flexible Class A1/A3/A4 floorspace, up to 14,666 sqm GEA of flexible Class B1 floorspace, up to 869 sqm GEA of flexible Class D1/D2 and up to 3,311 sqm GEA of multi use floorspace (A1/A3/A4/D1) within Building BF-F, a new secondary school, in buildings ranging from 6 to 36 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, childrens' playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and other associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme providing up to 130 residential units and up to 780 sqm GEA of flexible A1/A3/A4/D1/Sui Generis Uses and other associated works'.
Plot BC-01 And Building BC-6 Tower Bridge Business Complex 100 Clements Road Aka The Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Details of Condition 17 (b-g) - Construction Waste Management Plan for Building BC-6 (Compass School) only, required by planning permission 17/AP/4088 for 'Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed use scheme providing up to 1,418 residential units, up to 3,436 sqm GEA of flexible Class A1/A3/A4 floorspace, up to 14,666 sqm GEA of flexible Class B1 floorspace, up to 869 sqm GEA of flexible Class D1/D2 and up to 3,311 sqm GEA of multi use floorspace (A1/A3/A4/D1) within Building BF-F, a new secondary school, in buildings ranging from 6 to 36 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, childrens' playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and other associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme providing up to 130 residential units and up to 780 sqm GEA of flexible A1/A3/A4/D1/Sui Generis Uses and other associated works'.
46 - 50 Railway Street Altrincham WA14 2RE
Application for variation of conditions 2 (Approved Plans); 3 (Live Work Units); 4 (Materials); 5 (Construction & Design Detail); 9 (Surface Water Drainage); 10 (Construction Method Statement); 16 (Car Park Management Scheme); 19 (Noise & Vibration); 20 (Soundproofing) and 21 (Air Quality) on planning permission 95548/FUL/18 (Demolition of side and rear extensions to public house at 46 Railway Street and former bowling green pavilion building and erection of 4No three storey mews houses (with live/work arrangement). Conversion of public house to ground floor commercial (B1/A2) and 1No residential apartment to the upper floor. Erection of 24No apartments within a 4 storey building with associated landscaping and basement parking on land to the rear of 46-50 Railway Street. Vehicular access from The Downs with associated development thereto) to amend approved plans to allow for minor alterations to approved scheme including provision of an electricity sub-station and submission of details for approval previously reserved by condition.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.