Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
Deyes High School Deyes Lane Maghull Liverpool L31 6DE
Development of a 'net zero carbon in operation' eight-form entry Secondary School (Class F1) for 1,200 pupils to replace the current Deyes High School buildings except for the Sixth Form, for 300 pupils, which will be retained. Development comprises the demolition of the existing school buildings, excluding the Sixth Form, and the erection of a two and three story new building with associated indoor and outdoor sports facilities, a part-covered six court multi-use games area (MUGA), external canopies, an energy centre and service compound, covered cycle parking, motorcycle and car parking, alterations to the site access, hard and soft landscaping, fencing, boundary treatments and signage, together with the formation of a temporary access from Deyes Lane for construction purposes and the provision of contractor facilities and associated works required during construction.
Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Land Rear Of 39-41 Brentfield Road Dartford Kent
Erection of 6 No. semi-detached 3 bedroom dwellings with associated parking and amenity space. Access road and partial demolition and rebuilding of No. 41 Brentfield Road. Incorporating variation of condition 2 (approved drawings) and 18 (access / parking arrangements for No. 41 Brentfield Road) of planning permission DA/19/00777/VCON in respect of part demolition and re-building No. 41 Brentfield Road, amend part of the proposed access road, erection of electric entry gates, relocating boundary fencing for No. 39 Brentfield Road and amending the access, parking provision and landscaping for No. 41 Brentfield Road. As well as varying the details approved in relation to conditions 17 (parking management Strategy), and 19 (demolition and construction phasing for 41 Brentfield Road), and varying the wording of conditions 19 (works to No.41 Brentfield Road), 22 (permitted development restrictions at No. 41 Brentfield Road) and 23 (parking provision for No. 39 Brentfield Road).
Land OS 1100 Bindwell Lane Queen Camel Yeovil Somerset
Proposed solar farm and associated development, comprising the installation of solar panels, the erection of substation, switchgear, storage/communications buildings, the provision of inverter cabins and battery containers, construction of access and stone track, fencing and gates, installation of CCTV cameras, and associated landscaping and biodiversity enhancements.