Land At Tincklers Lane Tincklers Lane Eccleston
Application to discharge conditions no.7 (biodiversity enhancement measures), no.11 (arboricultural method statement and impact assessment), no.13 (existing and proposed ground levels), no.14 (position, layout and phasing of public open space), no.15 (foul and surface water drainage strategy), no.21 (details of cycle and pedestrian routes and connections), no.27 (external facing and roofing materials), no.28 (details of fences, walls and gates), no.29 (hard landscape details) and no.30 (electric vehicle charging scheme) of outline permission ref: 20/01331/OUTMAJ (outline planning application for the construction of up to 80 dwellings with all matters reserved aside from vehicular access from Doctors Lane. The development includes public open space, structural greenspace and surface water attenuation ponds) (Appeal ref: APP/D2320/W/21/3272310)
Broad Oak Farm Sweechgate Broad Oak Sturry CT2 0QR
Non-material amendment to planning permission CA/18/00868/FUL for the hybrid planning application comprising: detailed/full application for development of 456 residential dwellings comprising 402 houses and 54 flats, with associated open space, landscaping, car parking, access and other infrastructure (following demolition of 52 Shalloak Road, existing agricultural buildings and structures); and outline application (with all matters reserved) for development of a commercial area with up to 212sqm of Class A1 and up to 593sqm of Class B1 use; to allow fences to plots 336-338, footprint to flat blocks 348-395 and 366-377 updated, removal of screen wall to flat parking court entrances, materials to include product names and housing types amended from Dewhurst to Nuthurst, change of roof tile spec to monbond mini stonewold, closeboard fences to panel fencing and curved screen walls to chamfer, boundary treatments to show screenwalls to closeboard fence plots 28, 31, 75, 79, 103-108, 109-115, 165, 167 and 172, hardstanding added to plots 188 and 194, block paving to plots 408 and 412 extended, road surfaces and raised tables updated, plot 178 garage relocated, plots 162 and 163 compliance M4(2) removed and 71 and 269 M4(2) compliance added and parking, plots 150-151 and 155-156 carports combined, plot 150 relocated to north, Fairway plots 67-67,216-217,242-243 and 258-259 handed, driveway surface reduced to plots 25,179,194,203-204,233,309-312,326-327,330 and 335, grass verge added opposite 221-225, Layton type; roof construction, rainwater pipes, standardise tile hanging to Earleswood and Hereford and rainwater pipes revised, flat blocks; side doors omitted, window depth reduced to bathrooms, full brick cills indicated, inclusion of lift shaft, Barratt type; 73 fogs revised ground floor layouts, lutterworth front entrance canopy enlarged, Chester stone sills omitted and replaced with brick, updated carports to plots 155-156 and 4 bay carport omitted.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)