Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
Land North West Of Maldon Hall Farm Spital Road Maldon Essex
Variation of condition 3 (approved drawings) & removal of conditions 4 (Construction Method Statement), 8 (soft landscaping details) and 9 (hard surfacing details) on planning permission 17/01106/FUL (allowed on appeal APP/X1545/W/18/3204562) ( Proposed development of an energy storage system for a temporary period of 20 years from the date of first import/export of electricity comprising a battery compound with battery storage and ancillary equipment, two electricity compounds with ancillary equipment, fencing, access track, underground cabling and other associated works and infrastructure including hedgerow and tree planting.)
Land Parcel East Of Witpit Lane Preston Gloucestershire
Variation of conditions 1 (plans), 4 (landscape plan), 6 (habitat management plan), 8 (arboriculture statement), 10 (drainage strategy), 11 (working hours) and 14 (traffic management) of permission 20/02034/FUL (Variation of condition 2 (drawings) of permission 15/01923/FUL (Proposed development of solar photovoltaic modules including access, temporary construction compound; single and double inverter platforms; transfer station; collecting station; security fencing; CCTV cameras and poles; landscaping; and associated works and infrastructure including underground cable along London Road verge and Witpit Lane verge and related equipment to allow connection to the electricity distribution network) to change the inverter type, internal access arrangements, solar photovoltaic module and associated substructure specification, and dimensions of the transfer station (DNO substation) and collecting station (Customer substation)) to allow reconfiguration of solar array, associated landscaping, tree and ecological amendments, working hours revisions and revised Construction Traffic Management Plan