Land East Of Aldi And B&Q At Laporte Retail Park Dallow Road Luton
Erection of a commercial unit comprising 3159sqm of B8 (industrial warehouse) floorspace, together with associated access, car parking, external areas, yards and associated engineering works. Discharge of condition 3 (Construction and environmental management plan) of Planning permission 22/00141/FUL dated 8th November 2022.
The Potter Group Melmerby Industrial Estate Melmerby North Yorkshire
Partial discharge of conditions 3 (Details of Roads and Sewers) and 4 (Construction Management Plan) of 21/04869/DVCMAJ ( Variation of condition No. 1 of 15/04788/REMMAJ (Reserved Matters application for the erection of 5 industrial units with appearance, landscaping, layout and scale considered) to allow amendments to the scale, appearance, landscaping and layout of the approved scheme).
330 Purley Way Croydon CR0 4XJ
Discharge of condition 14d (contamination) attached to planning permission ref. 18/02908/FUL Planning permission 18/02908/FUL was for: Hybrid planning application comprising: (1) Full planning permission for the erection of three 1-2 storey units providing 4,116 sqm of floorspace for retail use (Use Class A1) and 232 sqm for flexible retail or restaurant use (Use Classes A1 and A3), with access, car parking, service yard, hard and soft landscaping and associated works. (2) Outline planning permission (all matters reserved) for the demolition of the existing retail unit (measuring 5,397 sqm) and the construction of three blocks (maximum four storeys) comprising up to 56 residential units (Use Class C3) and a ground floor retail unit (Use Class A1); a separate unit for business, industrial, and storage and distribution uses (Use Classes B1(b), B1(c), B2 and B8, maximum 2 storeys), and associated access, car parking, service provision, hard and soft landscaping and associated works.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Unit 7 Imperial Court Laporte Way Luton LU4 8FE
Removal of existing temporary building and storage containers and the erection of two storey new buildings to provide offices (Class E) and Class B8 industrial units with ancillary retail/ trade counter and show room, car parking and associated works. Discharge of Conditions no. 3 (Materials), 20 (Trees and Shrubs Safeguarding) and 22 (Construction and Environmental Method Statement) of planning permission 21/00358/FUL dated 20th August 2021.
Land Opp Power Station (Plot E) Humber Gate Energy Park Way Grimsby North East Lincolnshire
Details in discharge of Condition 6 (Construction Management Plan) and 7 (Piling) pursuant to DM/0625/19/FUL (Erection of industrial manufacturing building, installation of attenuation tank, erection of 2.4m high palisade fence/gates and make existing access redundant and create new access)
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Unit 7, Imperial Court Laporte Way Luton LU4 8FE
Removal of existing temporary building and storage containers and the erection of two storey new buildings to provide offices (Class E) and Class B8 industrial units with ancillary retail/ trade counter and show room, car parking and associated works. - Discharge of Condition Nos. 3 (Details of Materials), 08 (Surface Water Drainage), 20 (Safeguarding of trees, shrubs and hedges), 21 (Surfacing and Drainage of Car Park) and 22 (Construction and Environmental Method - CEMP) of Planning Permission No. 21/00358/FUL dated 10th March 2021
30 - 34 Old Paradise Street London SE11 6AX
Discharge of obligation under Schedule 4, Part 2 ( Employment Skills and Construction Plan) of Section 106 pursuant to planning permission ref: 19/04592/FUL (Demolition of existing buildings and erection of 6 storey building plus basement and roof plant to provide light industrial use (B1c), flexible B1a/b/c use and associated cycle parking and waste storage. Alterations and restoration of part of eastern boundary wall of Old Paradise Gardens and works to trees.). Granted 23.10.2020
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,196m² GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.