Orchard House The Orchard Chilworth Hampshire SO16 7JZ
Demolish garage, upgrade front, side and rear elevations, extension to provide garage, utility, kitchen, 2 home offices with 2 bedrooms with ensuites over, extend plant room, and construction of dormer windows
North Rose Cottage Baughurst Road Baughurst Hampshire RG26 5JF
Construction of two storey rear extension, front porch and lychgate. Raising of roof to garage to incorporate home office, including new dormer windows and re-cladding external walls
12 Burton Avenue Leigh Tonbridge KENT TN11 9FB
Demolition & removal of existing carport and construction of new single storey side extension with Garage at ground floor level & home office above within roof space with Dormer window/s to front & rear elevations
The Old Oast Lamberhurst Road Horsmonden Tonbridge Kent TN12 8LP
Conversion of open fronted car port to become a home office. Additional window added to external side wall. Construction of a dormer to rear side of roof.
Bethany Cottage Station Road Over Wallop Stockbridge Hampshire SO20 8HP
Conversion of first floor of garage to home office, construction of dormer window and external staircase
19 New Road Tylers Green Buckinghamshire HP10 8DJ
Householder application for raising of roof of existing detached garage incorporating construction of 2 x dormer windows to front elevation, 3 x rooflights rear elevation and enclosing of existing carport at ground floor to create double garage with home office and WC above
Estherene House 35 Kirkley Park Road Lowestoft Suffolk NR33 0LQ
Additional Environmental Approval of DC/17/0430/FUL - (Construction of a first floor extension to the front of the care home. A new lift shaft is also proposed at the back of the care home. The second floor is to be changed from offices to bedrooms whilst the ground floor will have part of its layout changed to make use of space better. Two chimneys are proposed to be demolished as well as some internal walls to create the lift shaft as well as change the floors layouts. Part of the existing roof will be demolished for the new roof of the first floor extension. The two dormer windows will also be demolished with two new ones in their place.) - extension of permission expiry period to 1 May 2021.