All Saints Catholic School Layhams Road West Wickham BR4 9HN
Variation of Condition 16 planning permission reference 17/02964/MATAMD (dated 5 April 2018 for Amendment to planning permission ref 13/03743/FULL3 granted for the demolition of all school buildings, with the exception of the Reception building, and part demolition of the North Stable block, and erection of 48 dwellings comprising 24x 4-bed houses, 16x 1-bed flats and 8x 2-bed flats and conversion of the stable block into 2x 2-bed residential units, together with 108 car parking spaces. Associated landscaping, hardstanding areas, cycle stores and bin stores. Conversion of existing Reception building to 799sqm of office floorspace (Class b1A) together with 8 dedicated car parking spaces and the construction of 2 tennis courts, designated car park. Erection of pavilion and amenity area for community use. Amendments to position of apartment blocks on the site, extension of apartment blocks at lower ground and upper ground floor levels, demolition of north stable block and erection of 2x 2-bed houses, alterations to proposed housing mix to provide 8x 1-bed and 16x 2-bed apartments, 24x 4-bed houses and 2x 2-bed houses, alterations to windows, doors and internal layout of House Types B and C, amendments to car parking, maintenance access to Wickham Court School, removal of pavilion and internal landscaping and footpaths. Discharge of condition 16 (layout of wheelchair units) for planning permission reference 13/03743/FULL3) to allow for Plot 30 to be built to wheelchair adaptable Building Regulations Part M4(2) rather than wheelchair user Building Regulations Part M4(3).
153 - 155 High Street Penge London SE20 7DS
Change of use of part of ground floor from shop to residential use (associated with reconfiguration to form refuse and cycle store) along with alterations to the shopfront, demolition of part of the first and second floors to form lightwell and conversion of first floor from offices and second/third floors from residential flats to HMO use and enlargement of third floor through construction of extension, with resultant overall first, second and third floor providing 26 bedroom House in Multiple Occupation.
Beckminster House Birches Barn Road Wolverhampton West Midlands WV3 7BJ
Redevelopment of existing site to include demolition of previous two storey office extension and various outbuildings, Access from Birches Barn Road only (no access from Holly Grove). Change of Use of Beckminster House from offices to residential apartments, construction of new apartment block and associated hard and soft landscaping. Application is a re-submission based upon amended details.
Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London
Non-material amendment pursuant to 16/AP/4018 [Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4; The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c to provide 44 no flats and 4 no townhouses and partial demolition of boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); part 4(Block B); a part four, part 6 storey building to provide 72 no flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level together with car parking, hard and soft landscaping, and other associated works incidental to the development] for the construction of a fire safety maintainance enclosure.
Land North West Of 2 Maldon Road Burnham-On-Crouch Essex
Variation of conditions 15 (site access construction),16, (site access layout), 17 (new footpaths) and 31 (approved drawings) on approved planning permission 18/00443/OUT ( Create retirement community consisting of 103No. one, two and three-bedroom bungalows (class C.3), 70 bedroom two-storey care home building (class C.2) and 55 bedroom two-storey assisted living apartment building (class C.3) including affordable housing. Erect ancillary community centre, 8No. shops (class A.1) with 8No. key workers apartments over in two-storey building, two-storey medical centre (GP, dental, optician, and dispensing chemist), and construct single-storey office and Maintenance Buildings. Lay Out Amenity and Sports Facilities Including Outdoor Swimming Pool, tennis courts, allotments and open spaces. Lay out estate roads, footpaths and surface water drainage infrastructure including swales and detention Basin. Form vehicular and pedestrian accesses onto B1010 Maldon Road and Tinkers Hole, and create associated hard and soft landscaping) (as amended by 22/00807/NMA) to accommodate amendment to site access
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
Phase 6 (Copley Castle Bar) Part Of The Copley Close Estate Copley Close Hanwell W7 1AZ
Details of Energy in pursuant to condition 37 of planning application Ref: 172235FUL dated 03/10/2018 for' Construction of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of buildings within the Copley Castlebar area within the Copley Close Estate (including 47 dwellings, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq. m. floor space in community use (D1 Use Class), and other structures) and the construction of 202 dwellings (46 x 1-bedroom flats, 129 x 2-bedroom flats, 4 x 2-bedroom houses and 23 x 4-bedroom houses) contained in buildings between 3 storeys and a maximum of 8-storeys; replacement retail (A1 Use Class) facilities comprising 412 sq. m. floor space; 195 sq. m community space (D1 Use Class) and community estate management office and meeting room (105 sq. m); alterations to the public highway to accommodate reconfigured and new parking providing a total of 47 spaces on-street, cycle parking facilities (388 spaces), engineering operations, landscaping and public realm works including lighting, landscaping and children's play equipment (Regulation 3 Application by London Borough of Ealing)'
Phase 6 (Copley Castle Bar) Part Of The Copley Close Estate Copley Close Hanwell London W7 1AZ
Details of Energy in pursuant to condition 36 of planning application Ref: 172235FUL dated 03/10/2018 for' Construction of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of buildings within the Copley Castlebar area within the Copley Close Estate (including 47 dwellings, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq. m. floor space in community use (D1 Use Class), and other structures) and the construction of 202 dwellings (46 x 1-bedroom flats, 129 x 2-bedroom flats, 4 x 2-bedroom houses and 23 x 4-bedroom houses) contained in buildings between 3 storeys and a maximum of 8-storeys; replacement retail (A1 Use Class) facilities comprising 412 sq. m. floor space; 195 sq. m community space (D1 Use Class) and community estate management office and meeting room (105 sq. m); alterations to the public highway to accommodate reconfigured and new parking providing a total of 47 spaces on-street, cycle parking facilities (388 spaces), engineering operations, landscaping and public realm works including lighting, landscaping and children's play equipment (Regulation 3 Application by London Borough of Ealing)'.
Land North West Of 2 Maldon Road Burnham-on-crouch Essex
Compliance with conditions notification 18/00443/OUT (Create retirement community consisting of 103No. one, two and three-bedroom bungalows (class C.3), 70 bedroom two-storey care home building (class C.2) and 55 bedroom two-storey assisted living apartment building (class C.3) including affordable housing. Erect ancillary community centre, 8No. shops (class A.1) with 8No. key workers apartments over in two-storey building, two-storey medical centre (GP, dental, optician, and dispensing chemist), and construct single-storey office and Maintenance Buildings. Lay Out Amenity and Sports Facilities Including Outdoor Swimming Pool, tennis courts, allotments and open spaces. Lay out estate roads, footpaths and surface water drainage infrastructure including swales and detention Basin. Form vehicular and pedestrian accesses onto B1010 Maldon Road and Tinkers Hole, and create associated hard and soft landscaping) Condition 14 - Construction method statement.
Phase 6 (Copley Castle Bar) Part Of The Copley Close Estate Copley Close Hanwell W7 1AZ
Details of the refuse / recycling storage enclosures and a Commercial Services Management Plan in pursuant to condition 17 of planning permission ref: 172235FUL dated 03/10/2018 for 'Construction of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of buildings within the Copley Castlebar area within the Copley Close Estate (including 47 dwellings, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq. m. floor space in community use (D1 Use Class), and other structures) and the construction of 202 dwellings (46 x 1-bedroom flats, 129 x 2-bedroom flats, 4 x 2-bedroom houses and 23 x 4-bedroom houses) contained in buildings between 3 storeys and a maximum of 8-storeys; replacement retail (A1 Use Class) facilities comprising 412 sq. m. floor space; 195 sq. m community space (D1 Use Class) and community estate management office and meeting room (105 sq. m); alterations to the public highway to accommodate reconfigured and new parking providing a total of 47 spaces on-street, cycle parking facilities (388 spaces), engineering operations, landscaping and public realm works including lighting, landscaping and children's play equipment (Regulation 3 Application by London Borough of Ealing)'.