Search Results

Found 49 planning applications

233392CND | Discharge Condition

Part Of The South Acton Estate Acton London W3 8RF

Submission of a construction management plan in pursuant to condition 8 (Central Plaza element only) of planning permission ref: 160794VAR dated 09/12/2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Withdrawn (Application Withdrawn)
Application Received
18/08/2023
Application Validated
18/08/2023
Alteration Erection Demolition Variation Amendment Construction Development Landscaping Residential Trees Office Shop
22/00629/CND | Discharge Condition

Alma Estate EN3

Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).

Local Authority
Enfield Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Granted)
Application Received
22/02/2022
Application Validated
22/02/2022
Variation Construction Landscaping Residential Trees Flat Shop
233131CND | Discharge Condition

Part Of The South Acton Estate Acton London W3 8RF

Submission of a Drainage Strategy plan in part pursuant to condition 16 (Phase 6 - as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Approved)
Application Received
31/07/2023
Application Validated
31/07/2023
Alteration Erection Demolition Variation Amendment Construction Development Landscaping Residential Trees Office Shop
233130CND | Discharge Condition

Part Of The South Acton Estate Acton London W3 8RF

Submission of a Remedial Scheme & Verification in part pursuant to condition 15 (as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Approved)
Application Received
31/07/2023
Application Validated
31/07/2023
Alteration Erection Demolition Variation Amendment Construction Development Landscaping Residential Trees Office Shop
CHE/23/00486/DOC | Discharge of Conditions

Land At Enterprise Way Enterprise Way Duckmanton Chesterfield Derbyshire

Discharge of conditions 4 (Phasing for vehicular and pedestrian accesses to Enterprise Way), 5 (Highway Construction Management Plan) and 8 (Tree protection plan and arboricultural method statement) of CHE/22/00272/FUL- Erection of electric vehicle charging station with ancillary uses including retail and food and drink with associated electrical infrastructure, car parking and landscaping

Local Authority
Chesterfield Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
(Discharge of Planning Conditions)
Application Received
09/08/2023
Application Validated
09/08/2023
Erection Construction Landscaping Discharge Trees Shop
23/AP/2112 | Variation: Non-Material Changes

Bells Gardens Community Centre 19 Buller Close London Southwark SE15 6UJ

Non material amendments for planning application ref: 21/AP/1077 dated 29/01/2022 for: (demolition of existing community centre and the construction of three new buildings consisting of a 7 stories, 6 stories and 5 stories to provide a retail unit fronting onto Commercial Way, and provision of 83 new Council homes, alongside the provision of the existing community facilities on the site as well as new landscaped areas including MUGA and playspace). To allow: -Removal of 2 existing Lime trees and replacement planting and their replacement with five new trees (comprising 2 x Tilia Cordata 'Greenspire' 30-35cm 350L and 3 x Tilia Cordata 'Greenspire' 20-25cm 250L) as specified by the Council's Tree Officer.

Local Authority
Southwark Council
Type
Other (Variation: Non-Material Changes)
Decision
(Agreed - for App Types VLA & VNMC)
Application Received
27/07/2023
Application Validated
28/07/2023
Demolition Construction Trees Shop
232164NMA | Non-Material Amendment

Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ

Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'

Local Authority
Ealing Council
Type
Application for non-material amendments following planning permission (Non-Material Amendment)
Decision
Approved (Grant with Conditions)
Application Received
01/06/2023
Application Validated
01/06/2023
Alteration Erection Demolition Variation Amendment Construction Development Landscaping Residential Trees Office Shop
23/01659/CND | Discharge Condition

Alma Estate EN3

Details pursuant to ref 17/04748/RM for Phase 2Aii a Management Strategy for the courtyard (5) in respect of the details pursuant to condition 5 of outline planning permission ref: 15/02039/OUT and as amended by 17/04670/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A, 2Ai and 2Aii of Alma Estate (Merlin House, Cormorant House, Silver Birch Court, Welcome Point and Ponders End Youth Centre) for the construction of five buildings varying between 2 and 8 storeys in height, comprising 340 residential units, Class A1/A2/B1/D1/D2 uses including provision of community centre, youth centre , medical centre, retail units, community offices and provision of energy centre, public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with discharge of conditions in respect of Phases 2A, 2Ai and 2Aii only for tree protection (9), acoustic assessment (27- part discharge), ecology and biodiversity strategy (31) green roofs (36), living walls (37), green procurement plan (43), SWMP (44), air quality (45), parking (52- part discharge in respect of Phase 2Ai and 2Aii only), loading/unloading (54), traffic calming (59), cycle parking (60) pursuant to outline permission ref:15/02039/OUT and as amended by 17/04670/VAR.

Local Authority
Enfield Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Granted)
Application Received
25/05/2023
Application Validated
25/05/2023
Construction Landscaping Residential Discharge Trees Office Shop House
23/01054/NMMA | Non Material Minor Amendments

Land At Watery Lane Church Crookham Fleet Hampshire

Amendment to positioning, boundary treatments/ landscaping and garden arrangements at plots 21-26 and 39-42 pursuant to 17/00264/REM Reserved matters application for appearance, landscaping, layout and scale pursuant to 14/00504/MAJOR: Outline planning application for up to 300 residential units, land for up to 1,050m2 D1 floorspace for a GP surgery including pharmacy and up to 370m2 A1 retail floorspace for a convenience foodstore and associated access, open space, playing pitches including a sports pavilion, MUGA and car park, landscaping, Suitable Alternative Natural Greenspace (SANG) including car park and improvements to the A287/Redlands Lane junction. Approval of details submitted in connection with the following conditions: 8 - Levels, 9 - Road construction details, 10 - Access and parking details, 16 - Badger surveys, 17 - Flood lighting, 18 - Ecological Management Plan, 19 - Surface Water Management Plan, 20 - Protection for Basingstoke Canal SSSI, 21 - Buffer zone for River Hart, 24 - Tree protection, 25 - Hard and soft landscaping, 26 - Landscape Management Plan, 30 - Drainage Strategy, 34 - Surface Water Drainage Scheme, 36 - Sport pitch parking demand assessment

Local Authority
Hart District Council
Type
Application for non-material amendments following planning permission (Non Material Minor Amendments)
Decision
Approved (Grant)
Application Received
10/05/2023
Application Validated
10/05/2023
Amendment Construction Landscaping Residential Trees Shop Boundary
23/AP/0909 | Approval of Details

Plot H11B Elephant Park London Southwark SE17 1JL

Details of condition 26 (Tree protection) part b only for Plot H11B as part of construction phase MP4 as required by planning ref. 12/AP/1092 (Outline application for: Redevelopment to provide a mixed use development comprising a number of buildings ranging between 13.13m (AOD) and 104.8m (AOD) in height with capacity for between 160,579sqm GEA (min) and 254,000sqm GEA (max) residential floorspace together with retail (Class A1-A5), business (Class B1), leisure and community (Class D2 and D1), energy centre (sui generis) uses. New landscaping, park and public realm, car parking, means of access and other associated works).

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
31/03/2023
Application Validated
03/04/2023
Construction Development Landscaping Residential Trees Shop