Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Tyne Bridge House Bottle Bank Gateshead
Proposed split-level office development (A2 and B1a uses) on two levels, with reception and meeting room at a lower level to the main office accommodation and a roof terrace, providing 522 sqm of office space and ancillary accommodation, demolition of existing sub-station, alterations to existing access steps and perimeter parapet walls, with the insertion of new fenestration on the northern and eastern elevations, re-alignment of the refuse store fence, and western wall and windows, and installation of planting strip at Bottle Bank (amended 02/10/20).