22/30013/SMI | Spheres of Mutual Interest

Longcross North Chobham Lane Longcross Chertsey KT16 0EE

Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Spheres of Mutual Interest)
Decision
(No Comment)
Application Received
10/05/2022
Application Validated
10/05/2022
Erection Demolition Variation Construction Roof Development Landscaping Office Fence
21/0639/PCA | Consultation Adjoining Authority

Upper Longcross Chobham Lane Longcross KT16 0EE

Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)

Local Authority
Surrey Heath Borough Council
Type
Other (Consultation Adjoining Authority)
Decision
(No Decision)
Application Received
01/06/2021
Application Validated
01/06/2021
Erection Demolition Construction Roof Development Landscaping Office Fence
21/30008/SMI | Spheres of Mutual Interest

Longcross North Chobham Lane Longcross Chertsey KT16 0EE

Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Spheres of Mutual Interest)
Decision
Approved (No Objection)
Application Received
01/06/2021
Application Validated
01/06/2021
Erection Demolition Construction Roof Development Landscaping Office Fence
DC/20/00708/FUL | Full Application

Tyne Bridge House Bottle Bank Gateshead

Proposed split-level office development (A2 and B1a uses) on two levels, with reception and meeting room at a lower level to the main office accommodation and a roof terrace, providing 522 sqm of office space and ancillary accommodation, demolition of existing sub-station, alterations to existing access steps and perimeter parapet walls, with the insertion of new fenestration on the northern and eastern elevations, re-alignment of the refuse store fence, and western wall and windows, and installation of planting strip at Bottle Bank (amended 02/10/20).

Local Authority
Gateshead Council
Type
Full planning consent (Full Application)
Decision
Approved (Grant)
Application Validated
12/08/2020
Alteration Demolition Roof Development Windows Accommodation Office Fence