104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Gatwick White House Hotel 52 Church Road Horley Surrey RH6 7EX
Submission of tree/hedge protection plans details pursuant to Condition 4 of permission 18/00351/F. The development of a new single storey private house on an existing enclosed site adjacent to and part of the Gatwick White House Hotel at the rear of 50 Church Road, Horley following the demolition of an existing timber garage, large shed and the preparation of the site.
Land At Chapel Bungalow Potbridge Odiham Hook Hampshire
Demolition of three existing dwellings, removal of shed, caravan and lean-to extension and erection of five self or custom build dwellings and all ancillary development (Additional tree and contaminated land information received 3rd January 2020)