1-3 Queensway, Purley Way And 12 Imperial Way Croydon CR0 4BD
Discharge of conditions 9 (Biodiversity Enhancement Strategy for Building CR1) and 10 (Biodiversity Enhancement Strategy for Building CR2) attached to planning permission 23/02149/CONR dated 12/10/2023 for Variation of Condition 2 (Approved Drawings), Condition 32 (Drainage Strategy) and Condition 33 (Drainage Strategy) of planning permission ref. 21/06359/FUL for demolition of all existing buildings and erection of two flexible industrial units (Use Classes E(g)(iii), B2 and B8), alongside the provision of parking and landscaping and associated works.
1-3 Queensway, Purley Way And 12 Imperial Way Croydon CR0 4BD
Discharge of conditions 6 (landscaping and boundary treatment for Building CR1) and 7 (landscaping and boundary treatment for Building CR2) attached to planning permission 23/02149/CONR dated 12/10/2023 for Variation of Condition 2 (Approved Drawings), Condition 32 (Drainage Strategy) and Condition 33 (Drainage Strategy) of planning permission ref. 21/06359/FUL for demolition of all existing buildings and erection of two flexible industrial units (Use Classes E(g)(iii), B2 and B8), alongside the provision of parking and landscaping and associated works.
1-3 Queensway, Purley Way And 12 Imperial Way Croydon CR0 4BD
Discharge of condition 39 (details of piling) attached to planning permission 23/02149/CONR dated 12/10/2023 for Variation of Condition 2 (Approved Drawings), Condition 32 (Drainage Strategy) and Condition 33 (Drainage Strategy) of planning permission ref. 21/06359/FUL for demolition of all existing buildings and erection of two flexible industrial units (Use Classes E(g)(iii), B2 and B8), alongside the provision of parking and landscaping and associated works.
1-3 Queensway, Purley Way And 12 Imperial Way Croydon CR0 4BD
Discharge of conditions 32 (drainage details Building CR1) and 33 (drainage details Building CR2) attached to planning permission 23/02149/CONR dated 12/10/2023 for Variation of Condition 2 (Approved Drawings), Condition 32 (Drainage Strategy) and Condition 33 (Drainage Strategy) of planning permission ref. 21/06359/FUL for demolition of all existing buildings and erection of two flexible industrial units (Use Classes E(g)(iii), B2 and B8), alongside the provision of parking and landscaping and associated works.
1-3 Queensway, Purley Way And 12 Imperial Way Croydon CR0 4BD
Discharge of condition 5 (details of fences) attached to planning permission 23/02149/CONR dated 12/10/2023 for Variation of Condition 2 (Approved Drawings), Condition 32 (Drainage Strategy) and Condition 33 (Drainage Strategy) of planning permission ref. 21/06359/FUL for demolition of all existing buildings and erection of two flexible industrial units (Use Classes E(g)(iii), B2 and B8), alongside the provision of parking and landscaping and associated works.
61 Lilford Road London SE5 9HY
Approval of details to discharge part a of condition 50 (Safety and Security) of planning permission ref: 22/04096/FUL (Demolition of the existing buildings and redevelopment of the site to provide a multi let industrial estate comprising Use Classes E (g) (ii) and (iii), B2 and B8 with cycle parking, hard and soft landscaping and associated works) granted on 01.08.2023.
Land To The East Of Montford Place, Kennington London SE11 5DE
Discharge of developer's obligation under Schedule 7, Part 2, paragraph 3.1.1 of the s106 agreement dated 15/09/2021 pursuant to planning permission 20/01086/FUL (Redevelopment of the site including the demolition of all existing buildings and structures, and erection of 2 linked buildings ranging from 6 to 11 storeys to provide a mixed use scheme comprising light industrial employment floorspace (Class B1c) with ancillary co-working/café space and residential units (Class C3) together with hard and soft landscaping and other associated works. This application is a DEPARTURE APPLICATION: The proposed development is a departure from Policy ED1 (Key Industrial and Business Areas (KIBAs) and Policy Q26(a)(ii) (Tall Buildings) of the Lambeth Local Plan (2015).). Granted on 16.09.2021.
Land To The East Of Montford Place, Kennington London SE11 5DE
Discharge of developer's obligation under Schedule 5, Paragraphs 1.1 and 1.2 (with regards to registering with Considerate Constructors Scheme and Nine Elms Charter) of the s106 agreement dated 15/09/2021 pursuant to planning permission 20/01086/FUL (Redevelopment of the site including the demolition of all existing buildings and structures, and erection of 2 linked buildings ranging from 6 to 11 storeys to provide a mixed use scheme comprising light industrial employment floorspace (Class B1c) with ancillary co-working/café space and residential units (Class C3) together with hard and soft landscaping and other associated works. This application is a DEPARTURE APPLICATION: The proposed development is a departure from Policy ED1 (Key Industrial and Business Areas (KIBAs) and Policy Q26(a)(ii) (Tall Buildings) of the Lambeth Local Plan (2015).). Granted on 16.09.2021.
330 Purley Way Croydon CR0 4XJ
Discharge of condition 14d (contamination) attached to planning permission ref. 18/02908/FUL Planning permission 18/02908/FUL was for: Hybrid planning application comprising: (1) Full planning permission for the erection of three 1-2 storey units providing 4,116 sqm of floorspace for retail use (Use Class A1) and 232 sqm for flexible retail or restaurant use (Use Classes A1 and A3), with access, car parking, service yard, hard and soft landscaping and associated works. (2) Outline planning permission (all matters reserved) for the demolition of the existing retail unit (measuring 5,397 sqm) and the construction of three blocks (maximum four storeys) comprising up to 56 residential units (Use Class C3) and a ground floor retail unit (Use Class A1); a separate unit for business, industrial, and storage and distribution uses (Use Classes B1(b), B1(c), B2 and B8, maximum 2 storeys), and associated access, car parking, service provision, hard and soft landscaping and associated works.
Building 260 270 And 280 Bartley Wood Business Park Bartley Way Hook
Discharge of condition no. 3 (Construction Management Plan) pursuant to planning permission (ref: 21/01800/FUL) for redevelopment of the site to provide 10 industrial units (14,122 sqm of floorspace for Flexible Use Class B2/B8/E(g)(i)-(iii)), together with associated parking, a new vehicular access off Griffin Way South, landscaping and other associated works (following demolition of existing buildings).