3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01012/LBC - Part demolition of rear flat roof extensions and erection of 2 storey rear extension; Alterations to front door and windows; Internal works to allow for the change of use from offices to part retail and part residential (Revised resubmission to NE/21/00340/LBC). Condition 3 - Windows and doors full details - scale drawings, cross sections and details of colour/finish. Condition 4 - external joinery details including windows and doors. Condition 5 - mortar composition and sample (hydraulic lime mortar)
70 - 72 Piccadilly London W1J 8HP
Amendments to planning permission dated 22nd July 2022 (RN: 20/06991/FULL) for, 'Part demolition of, and extensions to, the existing buildings, including a 2 storey roof extension; the refurbishment of the existing and creation of new office (Class B), hotel (Class C1), retail (Class A1 - A5) and Leisure and non-residential institutions (Class D1 - D2) floorspace with ancillary functions; basement refurbishment works; the erection of a 5 storey pavilion on the corner of Piccadilly and Dover Street; Installation of plant at roof level; hard and soft landscaping works as part of an improved public realm offering at Dover Yard and pedestrian route between Dover Street and Berkeley Street, including the creation of additional retail outlets; and other ancillary works. (Site includes 1 - 7 Berkeley Street)'; Namely, to update the approved roof plan to accommodate proposed tenant roof plant.
Land At 6 - 8 Salisbury Road Bromley
Demolition of existing garages and single storey buildings at Nos. 4 and 6-8 Salisbury Road. Construction of part 2-storey extension to existing shop including new roof to existing shop/office building at No 4. together with 2 No. new 2 storey 2-bed houses, associated access & parking for cars & cycles, landscaping, boundary treatment and storage sheds to include refuse & recycling provision for residential and commercial uses. (Renewal of existing permission - 17/03649/FULL1).
22-24 The Avenue West Ealing W13 8PH
Details of materials for external surfaces pursuant to condition 3 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
22-24 The Avenue West Ealing W13 8PH
Details of existing noise sources and sound insulation of the building envelope pursuant to condition 6 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
22-24 The Avenue West Ealing W13 8PH
Details of enhanced sound insulation for the floor/ceiling/wall structures pursuant to condition 8 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
22-24 The Avenue West Ealing W13 8PH
Details of external sound level from plant, machinery or equipment pursuant to condition 7 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01011/FUL. Change of Use from offices to part retail and part residential (3 apartments); Part demolition of rear flat roof extensions and erection of part single storey part two 2 storey rear extension; Alterations to front door and windows (revised resubmission to NE/21/00339/FUL) Condition 6 - details of the timber refuse store shown on the Proposed Site Plan ref. 20-098-01 Rev. A, to include the material, colour and measurements/elevations.
3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01012/LBC. Part demolition of rear flat roof extensions and erection of 2 storey rear extension; Alterations to front door and windows; Internal works to allow for the change of use from offices to part retail and part residential (Revised resubmission to NE/21/00340/LBC). Condition 3 - Window and door details including scale drawings, sections and finishes. Condition 4 - external joinery details including windows and doors Condition 5 - Mortar composition details for bedding and pointing stonework. Sample to be submitted.
Hammersmith Town Hall King Street London W6 9JU
Non-material amendment to approved Application (Ref: 2018/01500/FUL granted 22 October 2019) relating to the Demolition of 181-187 King Street, Town Hall Extension, Quaker Meeting House 20 Nigel Playfair Avenue (West), Register Office Nigel Playfair Avenue (West) and remainder of former Cineworld 207 King Street. Redevelopment, to include the Nigel Playfair Avenue (West) Car Park and Nigel Playfair Avenue (East), to provide four new build blocks comprising existing and new basements plus between six and eight storeys in height comprising 204 dwelling units (Class C3), retail (Class A1), Restaurant/café use (Class A3), Cinema (Class D2) and Office (Class B1) to include enterprise units; internal and external alterations and roof extension of the Grade II Listed Town Hall building to provide refurbished civic centre and new office use (Class B1); creation of a civic square and public realm works, play space, landscaping and associated residential and non-residential car parking (including disabled), cycle parking, motorcycle parking, access and servicing (EIA Development). Internal and external amendments to new build elements (Block A, C and D) including changes to terracotta panel sizes, winter gardens, windows, and cores.