6 Denby Dale Road Wakefield WF1 1HR
Non-material amendment pursuant to approved application 22/01342/FUL dated 22.09.2022 (Change of use of gym (D2) to self-storage facility (B8) with ancillary office space, associated roof alterations (including an increase in overall ridge height), elevational changes, landscaping and infrastructure (including new fencing) and demolition of existing ground floor extensions) to allow external alterations to the approved building
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
6 Denby Dale Road Wakefield WF1 1HR
Change of use of gym (D2) to self-storage facility (B8) with ancillary office space, associated roof alterations (including an increase in overall ridge height), elevational changes, landscaping and infrastructure (including new fencing) and demolition of existing ground floor extensions.
Mayberry Garden Centre Old Shoreham Road Portslade Brighton BN41 1SP
Erection of extension to south and west of existing Garden Centre, providing Internal Retail Area, Warehouse and associated Goods Delivery Yard. Extension and landscaping of External Retail Area to west of Garden Centre including new security fencing to Western boundary. Demolition of existing frost canopies and erection of new semi-enclosed glass roof frost canopy. Diversion of existing Public Right of Way. Creation of new vehicle access from Old Shoreham Road. Internal alterations including relocation of Offices and replacement of existing Goods Lift.
The Pines 27 Clarendon Road Sevenoaks KENT TN13 1EU
Demolition of shed and summer house, single storey rear extension connecting to existing garage, convert garage into habitable space, raised terrace decking area, single storey front extension to South East elevation, single storey side extension with new porch canopy over to North East elevation, first floor extension to North East elevation, loft conversion with projecting dormer, outbuilding for home office use, new parking area, balustrades, pergola, cladding, landscaping, new fencing and gate and roof lights.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
22 The Park London NW11 7SU
Single storey rear extension following demolition of existing single storey lean-to. Construction of a single storey outbuilding with flat roof for use as home office following demolition of Garage 01. Conversion and refurbishment of existing Garage 02 outbuilding into a workshop / games room with enlarged openings, new doors/ windows and new pitched roof. Landscaping works including changes to levels and creation of a lower patio. New timber decking and fencing.
Kelling Heath Holiday Park Sandy Hill Lane Weybourne Norfolk NR25 7HW
Removal/demolition of existing single storey flat roof buildings, temporary buildings and sheds; erection of a new 2 storey staff office and storage building; front extension to existing single storey building at the south end of the yard; new vehicle storage/car port building; excavation of banking/vegetation and installation of low key retaining structure (i.e. gabion) to provide an extension to the yard area; surfacing, boundary treatment and landscaping area, including new gate, fence line and planting on 0.29 hectares of land at the existing maintenance yard/staff welfare area
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)