Building 8 Bradbourne Drive Tilbrook Milton Keynes MK7 8AT
Change of use of building 8 from B8 (Storage and workshop) to B2 (General Industrial) with ancillary office and meeting space and partial demolition and refurbishment incorporating the creation of a new entrance, the erection of a two storey front extension, recladding of the side elevations and replacement of the existing roof with new metal roof for use as part of the Red Bull Technology Hub (retrospective)
Erlings Works Half Acre Road Denholme Bradford West Yorkshire BD13 3SG
Building operations to reinstate animal by-products process plant and roof mounted solar PV equipment following fire damage, demolition of outrigger extension at rear and shelter roof structures on west side, structural alterations to create extensions to front and west side, replacement and resizing of industrial access doors, installation of concrete wall sections to replace blockwork walls, installation of new wall and roof cladding, re-siting of two silo tanks (retrospective)