Markham Employment Growth Zone Markham Lane Duckmanton Derbyshire S44 5HS
Discharge of condition 33 (Design Framework) of CHE/15/00291/REM1 (Variation of conditions 6, 7, 9, 13, 18, 20, 21, 31, 32, 34, 37 and 39 of CHE/13/00781/EOT - Commercial (not major retail) office, industrial and warehouse development new and altered roads (including a motorway junction) land reclamation,ground re-modelling,drainage landscaping and re-use of railheads on 360 hectares of land in Bolsover, Staveley and Sutton-cum-Duckmanton on both sides of the M1 in the vicinity of the former Markham Colliery A632 (Chesterfield Road) Erin Road, Lowgates, Eckington Road, Hall Lane and the A619 south of Staveley and land off, Chesterfield Road, Erin Road, Lowgates, Eckington Road)
Dockley Road Industrial Estate 2 Dockley Road London Southwark
Discharge of Schedule 9, Clause 1.1 (Employment and Skills Methodology) of the section 106 agreement associated with permission 18/AP/0091 (as amended by 20/AP/1566 - Variation of Condition 1 'Approved Plans' of planning permission LBS reg no 18/AP/0091 for the demolition of the existing industrial units and redevelopment to provide a building ranging from one to nine storeys (32.7m AOD) in height accommodating 1,089sqm of commercial floorspace at ground floor level incorporating industrial use (Use Class B8); retail uses (Use Class A1); and restaurants and cafe uses (Use Class A3) and 111 residential units (Class C3) at upper levels with associated works, including landscaping and 3 disabled car parking spaces. The variation comprises: Increasing the number of affordable homes within the development (total number of units is unchanged) with related minor changes to the approved plans).
Land At Genesis Way Europarc Healing North East Lincolnshire DN37 9TU
Details in discharge of Condition 4 (Highway Details), 5 (Construction Management Plan), 6 (Flood Risk), 8 (Surface Water Drainage), 10 (Improving Air Quality) pursuant to DM/0120/19/REM (Reserved matters application following DC/323/12/WOL (Development of remaining plots on Europarc- B1 (office, research & development, light industry), B2 (general industry), B8 (storage & distribution), C1 (hotel), A1(shops), A2 (financial & professional services), A3 (restaurants & cafes), A4 (drinking establishments), D1 (non-residential institutions (Creche), D2 (assembly & leisure (Gymnasium) uses) to erect 2 industrial units and associated works with appearance, scale, layout, access, and landscaping to be considered)
Markham Employment Growth Zone Markham Lane Duckmanton Chesterfield
Discharge of condition 33 (Design Framework) of CHE/15/00291/REM1 (Variation of conditions 6, 7, 9, 13, 18, 20, 21, 31, 32, 34, 37 and 39 of CHE/13/00781/EOT - Commercial (not major retail) office, industrial and warehouse development new and altered roads (including a motorway junction) land reclamation,ground re-modelling,drainage landscaping and re-use of railheads on 360 hectares of land in Bolsover, Staveley and Sutton-cum-Duckmanton on both sides of the M1 in the vicinity of the former Markham Colliery A632 (Chesterfield Road) Erin Road, Lowgates, Eckington Road, Hall Lane and the A619 south of Staveley and land off, Chesterfield Road, Erin Road, Lowgates, Eckington Road)