Roots In The Sky (Site Of The Former Blackfriars Crown Court) 1-15 Pocock Street London Southwark SE1 0BT
Partial discharge of Schedule 8, Part 1, Clause 1.1 'Employment and Skills Methodology' of the Section 106 Agreement attached to planning permision 22/AP/1347, which itself is an amendment of planning permission 20/AP/1537, for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
135 Park Street And 4-8 Emerson Street London SE1 9EA London SE1
Discharge of S106 Obligation: Clause 5.1.4 (Substantial Implementation) as required by planning permission 19/AP/0240 for Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works.
Three Rivers Business Centre Felixstowe Road Foxhall Suffolk
Discharge of Condition No. 9 of DC/22/3591/FUL - Erection of 3 no. office units with a Class E (g)(i) use class. that development achieves a high-quality design, which is responsive and sympathetic to its surroundings. The existing units on site adopt a traditional agricultural barn vernacular utilising red brick and weatherboarded elevations with pantile roof. The proposed units would be of a similar form, scale and appearance of the existing units, specifically the units to the south of the site, but the proposed units would incorporate rooflights to enable floor space to be accommodated within the roof. The proposed units would utilise an area vacant maintained land, adjoining the existing business units. The of site is of a significant size to accommodate the proposed building and associated parking without it appearing cramped or contrived. By way of location and form, the proposed development would not detrimentally affect the wider landscape - Precise details of a tree and/or hedge planting scheme
135 Park Street And 4-8 Emerson Street London SE1 9EA London SE1
Discharge of obligation Schedule 5, Clause 2.12 'Local Market Rent' of the Section 106 Agreement attached to planning permission 19/AP/0240 for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
135 Park Street And 4-8 Emerson Street London SE1 9EA London SE1
Discharge of obligation Schedule 5, Clause 2.1 'Affordable Workspace Specification' of the Section 106 Agreement attached to planning permission ref. 19/AP/0240 for "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
135 Park Street And 4-8 Emerson Street London SE1 9EA London SE1
Discharge of Schedule 5, Clause 3.1 Affordable Workspace Marketing of the Section 106 Agreement attached to planning permission ref. 19/AP/0240 for "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Discharge of planning obligation Schedule 9, Clause 3.1 (Be Seen Energy Performance Indicators) of the Section 106 Agreement associated with planning permission 22/AP/1347 'Minor material amendments to planning permission 20/AP/1537 [approval date: 06.05.2021] for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses. The amendments comprise: - basement and structural alterations including deepened and extended basement and revised piling approach; - cross laminated timber floor construction changed to concrete plank system; - addition of external structural columns on Sawyer Street façade; - internal reconfiguration including consolidation of cores, relocated refuse store, revised cycle parking and end of journey facilities, revised affordable workspace and community auditorium design; - fire strategy updates; - external alterations to doors and repositioning of south-east external stair; - relocation of visitor cycle parking; - rooftop amendments including revised swimming pool and atrium, revised roof plant enclosures, revised Community Pavilion layout, provision of additional office space; and - the addition of 37 more trees.'.
2 - 14 Palmer Street London SW1H 0AP
Amendments to planning permission dated 11 March 2020 (RN: 19/03757/FULL) for the: Demolition and redevelopment of existing building to provide a nine storey building (Basement, Lower Ground, Ground + 6 upper floors) and roof level plant, providing flexible commercial units at ground floor (Classes A1/A2/A3/D2) and lower ground floor (Class D2 gym), office accommodation (Class B1a) on upper levels, with cycle parking, changing facilities, waste storage and plant at basement level. NAMELY, to allow amendments to condition 4 to introduce a revised staging of the development to enable a further partial discharge of the condition.
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition Nos. 3, 5, 6, 11, 12, 14, 15 and 20 of DC/21/5052/VOC. Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - Condition 3: Schedule of wall and roof materials rev B, Condition 5: Vapour Risk Assessment, Condition 6: Remediation Verification Report, Conditions 11 and 12 : Surface water disposal strategy and maintenance, Condition 14: Construction surface water management plan, Vapour risk assessment, Remediation verification report, Phase 2 contaminated land report and Phase 1 and 2 geo environmental assessment
135 Park Street And 4-8 Emerson Street London SE1 9EA
Discharge of Schedule 8, Clause 1.1 'Demolition Environmental Management Plan' and Schedule 8, Clause 1.2 'Construction Environmental Management Plan' of the Section 106 Agreement attached to planning permission 19/AP/0240, for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".