Selhurst Sports Arena Dagnall Park South Norwood London SE25 5PH
Discharge of Condition 3 (external materials), Condition 4 (hard and soft landscaping), Condition 5 (Refuse Management Plan), Condition 6 (refuse and cycle storage), Condition 8 (artificial lighting) and Condition 14 (sustainability) attached to permission 22/01803/FUL for 'Demolition of existing single storey changing facility and removal of site management office. Erection of 2-storey multi-purpose sports pavilion with changing room facilities and associated works.'
All Saints Catholic School Layhams Road West Wickham BR4 9HN
Variation of Condition 16 planning permission reference 17/02964/MATAMD (dated 5 April 2018 for Amendment to planning permission ref 13/03743/FULL3 granted for the demolition of all school buildings, with the exception of the Reception building, and part demolition of the North Stable block, and erection of 48 dwellings comprising 24x 4-bed houses, 16x 1-bed flats and 8x 2-bed flats and conversion of the stable block into 2x 2-bed residential units, together with 108 car parking spaces. Associated landscaping, hardstanding areas, cycle stores and bin stores. Conversion of existing Reception building to 799sqm of office floorspace (Class b1A) together with 8 dedicated car parking spaces and the construction of 2 tennis courts, designated car park. Erection of pavilion and amenity area for community use. Amendments to position of apartment blocks on the site, extension of apartment blocks at lower ground and upper ground floor levels, demolition of north stable block and erection of 2x 2-bed houses, alterations to proposed housing mix to provide 8x 1-bed and 16x 2-bed apartments, 24x 4-bed houses and 2x 2-bed houses, alterations to windows, doors and internal layout of House Types B and C, amendments to car parking, maintenance access to Wickham Court School, removal of pavilion and internal landscaping and footpaths. Discharge of condition 16 (layout of wheelchair units) for planning permission reference 13/03743/FULL3) to allow for Plot 30 to be built to wheelchair adaptable Building Regulations Part M4(2) rather than wheelchair user Building Regulations Part M4(3).
Land East Of Newlink Business Park Off A17 Coddington
Request for confirmation of discharge of conditions 6 (Construction Method Statement) and 7 (Drainage) attached to planning permission 20/01452/OUTM; Erection of one distribution building (Use Class B8) together with ancillary offices, plot access, car parking and landscaping.
West End Land North Of Brick Kiln Road Raunds
Discharge of conditions pursuant to 20/00960/FUL - Erection of four employment units (Use Class B1(c)/B2/B8) with ancillary offices, including new vehicular and pedestrian access, HGV and car parking, internal access roads, servicing, external lighting, landscaping, infrastructure and associated works. Condition 3 - Existing ground levels and proposed finished slab levels Condition 12 - Construction of the acoustic mounding along the southern boundary of the site Condition 13 - Location, extent, design and construction of noise barriers Condition 24 - Written Scheme of Investigation
Staunton Industrial Estate Alverton Road Staunton In The Vale
Request for confirmation to discharge conditions 4 (Hard and Soft Landscaping), 8 (Ecological Enhancement Strategy), 9 (Lighting Impact Assessment) attached to planning permission 21/02386/FULM Erection of commercial storage units and erection of new office with associated parking. (Resubmission)
CMR 207 Lancaster Way Business Park Ely Cambridgeshire CB6 3NX
To discharge Condition 4 (BREEAM) of decision dated 22 December 2021 for 21/01410/RMM Reserved matters for Erection of E(g), B2 and B8 industrial building, with ancillary office, warehouse, service yard, plant, PV panels external lighting, electric vehicle charging points, car park and cycle parking, including site entrance and associated infrastructure. The original application was EIA development and an ES was provided at that time, of previously approved 08/00563/ESO for the Extension to Lancaster Way Business Park including infrastructure, roads services yards, drainage and landscape works
Plot 1, Gloucester Business Park
Reserved Matters Application in relation to Plot 1 for the Erection of Employment Development of 4,731 sqm (GIA), access arrangements, servicing, parking including cycle provisions, electric vehicle charging and landscape provision comprising of Class B2 and B8 Development with ancillary offices, alongside discharge of conditions 8 and 11 (reserved matters requirements) to planning permission reference 11/01155/FUL.
Plot 2, Gloucester Business Park
Reserved Matters Application in relation to Plot 2 for the Erection of Employment Development of 3,259 sqm (GIA), access arrangements, servicing, parking including cycle provisions, electric vehicle charging and landscape provision comprising of Class B2 and B8 Development with ancillary offices, alongside discharge of conditions 8 and 11 (reserved matters requirements) to planning permission reference 11/01155/FUL.
Beckett House 60 - 68 St Thomas Street London Southwark SE1 3QU
Discharge of obligation Schedule 5 Paragraph 1.1 'Public Realm Specification' and 5.1 'Landscaping Strategy' as required by Section 106 agreement associated with planning permission 20/AP/0944: 'Redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.'
Land At Urlay Nook Road Eaglescliffe Stockton-On-Tees TS16 0QG
Information to discharge conditions no12 (Energy Efficiency) and no19 (Recording of a heritage asset through a programme of archaeological works) of planning approval 22/0314/REV - Revised application for the erection of B2/B8 warehouse with ancillary attached office accommodation and 3no. B2/B8 hybrid blocks (comprising 17no. individual units) to include associated access, works, and landscaping.