CMR 207 Lancaster Way Business Park Ely Cambridgeshire CB6 3NX
To discharge Condition 4 (BREEAM) of decision dated 22 December 2021 for 21/01410/RMM Reserved matters for Erection of E(g), B2 and B8 industrial building, with ancillary office, warehouse, service yard, plant, PV panels external lighting, electric vehicle charging points, car park and cycle parking, including site entrance and associated infrastructure. The original application was EIA development and an ES was provided at that time, of previously approved 08/00563/ESO for the Extension to Lancaster Way Business Park including infrastructure, roads services yards, drainage and landscape works
Unit 3A East Horndon Business Park Tilbury Road West Horndon Brentwood Essex CM13 3LR
Discharge of conditions 6 (Surface water drainage scheme), 7 (Scheme to minimise risk of offsite flooding), 8 (Maintenance Plan) and 12 (Fencing for trees and hedges), of application 22/01751/FUL (Full planning application for the development of a Class B2 / B8 building (industrial and storage and distribution including ancillary office provision), with associated access, vehicle and cycle parking, servicing, landscaping, and infrastructure.)
Former Poison Cross Nursery Foxborough Hill Woodnesborough Kent
Discharge of condition 3 (materials), condition 5 (boundary treatment), condition 6 (bin and cycle store), condition 7 (hard and soft landscaping), condition 16 (bus stop) pursuant to application 21/00421 Erection of 6no. detached dwellings and 3no. buildings containing 8no. units for office and light industrial use (Use Class E(g)) with new vehicle access, associated parking and landscaping
Land At Unit 1190 Park Avenue Aztec West Almondsbury South Gloucestershire BS32 4FP
Discharge of condition 4 (Arboricultural Method Statement) attached to planning permission P22/06408/F - Erection of industrial/warehousing building (Use Class E(g)(iii), B2, B8) with ancillary office floorspace; creation of new vehicular access; associated parking and landscaping.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land At Cross Lane Fernwood Business Park Fernwood
Request for confirmation of discharge of conditions 08 (Highways) and 10 (External Lighting) attached to planning permission 22/00862/FULM; Proposed industrial warehouse development suitable for 4no. B2/ B8 Units Use Classes with ancillary E(g)(i) Office space, including service yards, car parking, landscaping and associated access infrastructure.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,196m² GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
207 Lancaster Way Business Park Ely Cambridgeshire CB6 3NX
To discharge condition number 11 (External Lights) of Decision dated 22.12.2021 for Reserved matters for Erection of E(g), B2 and B8 industrial building, with ancillary office, warehouse, service yard, plant, PV panels external lighting, electric vehicle charging points, car park and cycle parking, including site entrance and associated infrastructure. The original application was EIA development and an ES was provided at that time, of previously approved 08/00563/ESO for the Extension to Lancaster Way Business Park including infrastructure, roads services yards, drainage and landscape works
Lyons Park Former Lawrence Automotive Site Sayer Drive Coventry CV5 9PF
Submission of details to discharge condition Nos. 12 (Gas monitoring) , 18 (parts 3 & 4) (Contamination) and 25 (Directional signage and road markings); imposed on S73/2022/0165 granted on 06/05/2022 for variation of condition No.2 - to enable amendment to height of building and addition of a door - imposed on planning permission reference FUL/2020/2794 granted on 12/11/2021 for construction of an industrial unit (General Industrial (Class B2) and/or Storage and Distribution (Class B8) use) with ancillary offices, access, servicing, parking, drainage and landscaping. Construction of HGV trailer parking for adjacent unit (Class B8) with pre-check offices, lighting, drainage and landscaping; and all other ancillary works