Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Alma Estate EN3 4QD
Details pursuant to ref: 17/04670/VAR: levels (12) for Phase 2A only, for the Section 73 planning application to develop land without complying with the conditions attached to Planning Permission Ref 15/02039/OUT granted on 20 June 2017 as described below: Outline planning application for the phased regeneration of the Alma Estate comprising the demolition of Cormorant House, Curlew House, Kestrel House, Merlin House, Silver Birch Court, 1-34 Fairfield Close, 15-107 (odd) 63 (flats 1-9) Alma Road, 7-89 (odd) Napier Road, 5, 7, 9, 21-43 (odd), 45 Scotland Green Road, 98-142 (even), 171a South Street, Ponders End Youth Centre and Welcome Point Community Centre (including 746 residential units, 866sqm of retail shops and other uses with the South Street local parade, 1540sqm of community facilities, and associated works) and the erection of a maximum of 993 residential units, a maximum of 716 sqm of flexible retail (A1/A2) floorspace, 150sqm of restaurant/café (A3) floorspace, 2892-3193sqm of community (D1)/leisure (D2) floorspace (to include 1761 sqm for provision of a community centre and youth centre, 160 sqm of flexible A2/B1/D1/D2 floorspace , 439sqm for a gym and minimum of 532sqm to a maximum of 833sqm for a medical centre), retention of existing Multi-Use-GamesArea (MUGA), site wide energy centre, relocation and provision of telecommunications equipment, resited open space and play facilities, landscaping, new access arrangements and highway works, public realm, car parking and associated works (all matters reserved). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations)).
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Alma Estate EN3
Details pursuant to ref: 17/04670/VAR: Verification report (19), for Phase 2A(i) for the section 73 planning application to develop land without complying with the conditions attached to Planning Permission Ref 15/02039/OUT granted on 20 June 2017 as described below: Outline planning application for the phased regeneration of the Alma Estate comprising the demolition of Cormorant House, Curlew House, Kestrel House, Merlin House, Silver Birch Court, 1-34 Fairfield Close, 15-107 (odd) 63 (flats 1-9) Alma Road, 7-89 (odd) Napier Road, 5, 7, 9, 21-43 (odd), 45 Scotland Green Road, 98-142 (even), 171a South Street, Ponders End Youth Centre and Welcome Point Community Centre (including 746 residential units, 866sqm of retail shops and other uses with the South Street local parade, 1540sqm of community facilities, and associated works) and the erection of a maximum of 993 residential units, a maximum of 716 sqm of flexible retail (A1/A2) floorspace, 150sqm of restaurant/café (A3) floorspace, 2892-3193sqm of community (D1)/leisure (D2) floorspace (to include 1761 sqm for provision of a community centre and youth centre, 160 sqm of flexible A2/B1/D1/D2 floorspace , 439sqm for a gym and minimum of 532sqm to a maximum of 833sqm for a medical centre), retention of existing Multi-Use-GamesArea (MUGA), site wide energy centre, relocation and provision of telecommunications equipment, resited open space and play facilities, landscaping, new access arrangements and highway works, public realm, car parking and associated works (all matters reserved). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations)).
Pine End Works & Land To The North Harbour Road Lydney Gloucestershire GL15 4ER
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Alma Estate EN3
Details submitted pursuant to planning application ref: 17/04670/VAR comprising of lighting (13) in respect of Section 73 planning application to develop land without complying with the conditions attached to Planning Permission Ref 15/02039/OUT granted on 20 June 2017 as described below: Outline planning application for the phased regeneration of the Alma Estate comprising the demolition of Cormorant House, Curlew House, Kestrel House, Merlin House, Silver Birch Court, 1-34 Fairfield Close, 15-107 (odd) 63 (flats 1-9) Alma Road, 7-89 (odd) Napier Road, 5, 7, 9, 21-43 (odd), 45 Scotland Green Road, 98-142 (even), 171a South Street, Ponders End Youth Centre and Welcome Point Community Centre (including 746 residential units, 866sqm of retail shops and other uses with the South Street local parade, 1540sqm of community facilities, and associated works) and the erection of a maximum of 993 residential units, a maximum of 716 sqm of flexible retail (A1/A2) floorspace, 150sqm of restaurant/café (A3) floorspace, 2892-3193sqm of community (D1)/leisure (D2) floorspace (to include 1761 sqm for provision of a community centre and youth centre, 160 sqm of flexible A2/B1/D1/D2 floorspace , 439sqm for a gym and minimum of 532sqm to a maximum of 833sqm for a medical centre), retention of existing Multi-Use-GamesArea (MUGA), site wide energy centre, relocation and provision of telecommunications equipment, resited open space and play facilities, landscaping, new access arrangements and highway works, public realm, car parking and associated works (all matters reserved). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations)).
Alma Estate EN3
Details pursuant to ref: 17/04670/VAR: piling (22), for Phase 2A for the section 73 planning application to develop land without complying with the conditions attached to Planning Permission Ref 15/02039/OUT granted on 20 June 2017 as described below: Outline planning application for the phased regeneration of the Alma Estate comprising the demolition of Cormorant House, Curlew House, Kestrel House, Merlin House, Silver Birch Court, 1-34 Fairfield Close, 15-107 (odd) 63 (flats 1-9) Alma Road, 7-89 (odd) Napier Road, 5, 7, 9, 21-43 (odd), 45 Scotland Green Road, 98-142 (even), 171a South Street, Ponders End Youth Centre and Welcome Point Community Centre (including 746 residential units, 866sqm of retail shops and other uses with the South Street local parade, 1540sqm of community facilities, and associated works) and the erection of a maximum of 993 residential units, a maximum of 716 sqm of flexible retail (A1/A2) floorspace, 150sqm of restaurant/café (A3) floorspace, 2892-3193sqm of community (D1)/leisure (D2) floorspace (to include 1761 sqm for provision of a community centre and youth centre, 160 sqm of flexible A2/B1/D1/D2 floorspace , 439sqm for a gym and minimum of 532sqm to a maximum of 833sqm for a medical centre), retention of existing Multi-Use-GamesArea (MUGA), site wide energy centre, relocation and provision of telecommunications equipment, resited open space and play facilities, landscaping, new access arrangements and highway works, public realm, car parking and associated works (all matters reserved). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations)).