Site Of Former Royal Oak 53 High Street Mosborough Sheffield S20 5AF
Application to allow storage of bins externally within an enclosure (Application under Section 73 to vary condition no. 40 (bin storage) imposed by planning permission 23/01630/FUL & 21/03651/FUL - Demolition of public house (retrospective) and erection of single-storey building comprising 3 no. retail units (Use Class E) with associated parking and landscaping (amended description as per amended plans published 08.02.2022)
Site Of Former Royal Oak 53 High Street Mosborough Sheffield S20 5AF
Application to vary opening hours to 0700 to 2200 Monday to Saturday (Application under Section 73 to vary condition no. 33 (Opening Hours) imposed by planning permission 21/03651/FUL - Demolition of public house (retrospective) and erection of single-storey building comprising 3 no. retail units (Use Class E) with associated parking and landscaping (amended description as per amended plans published 08.02.2022)
The Royal Oak 53 High Street Mosborough Sheffield S20 5AF
Demolition of public house (retrospective) and erection of single-storey building comprising 3 no. retail units (Use Class E) with associated parking and landscaping (amended description as per amended plans published 08.02.2022)
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)