104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 4th March 2020 (RN 19/06767/FULL) which permitted variations to conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) : Namely to amend the description of development to read as follows: Variation of conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) for the: Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works.(Linked application 16/11377/LBC) AND; amendments including internal reconfigurations to 30 Gloucester Place and changes to approved plant layout, amendments to the ground floor retail shopfronts on the 19-35 Baker Street building; internal reconfigurations to 88-110 George Street resulting in a re-distribution of the residential mix, a change to the residential entrances, amendments to rooftop plant and green roofs, replacement of glazed windows with blind windows on the north, east and west elevations, and amendments to courtyard landscaping and green roofs of courtyard buildings.
Peabody Estate St Johns Hill London SW11 1TY
Details Landscape General Arrangement plan, Tree Planting Plan, Hard Landscape, Plan, Walls& Boundaries Plan, Soft Landscape Schedule and Landscape Specifications pursuant to conditions 3 and 13 of planning permission dated 15/01/2019 ref 2017/5837 (Variation of condition 15 (in accordance with approved drawings) pursuant to planning permission dated 18/10/2012 ref 2012/1258 (Demolition of all existing buildings. Erection of 5 buildings of 4-12, 4-8, 7, 5-7 and 4-6 storeys to provide 527 residential units (135 x 1 bed, 261 x 2 bed,105 x 3 bed and 26 x 4 bed), with approx. 7800 square metres of private, communal & public space & public routes. Car parking (121 spaces within basement and 15 spaces at grade), 687 cycle parking spaces plus approximately 530 square metres of community space in the centre of the site and approximately 569 square metres of commercial space (classes A1-A5 (retail, financial and professional services, cafe/restaurant, take away, pub/bar and/or B1 office use) at the northern end of the site. Vehicular accesses from Comyn Rd and Eckstein Rd and emergency access from St John's Hill and Strath Terrace.) to allow: Plot 2: two storey increase allowing an additional 23 flats and change in tenure to older persons social rent only, removal of basement carparking; Planning Portal Re: PP-08149002 Plot 3: two storey increase to the centre tower allowing an additional 11 flats and change in tenure to private rent only; Plot 6: one storey increase allowing three additional flats; Plot 7: four additional flats (through internal reconfigurations); Plot 8: loss of one flat; Plot 9: One storey increase to the western section, extension of southern section facing Comyn Rd to close the building gap and removal of corner feature to Comyn Rd to allow 31 additional flats, inclusion of parking below podium level; General alterations to fenestration and finishes to accommodate changes and reconfiguration of carparking resulting in a loss of 28 spaces. Overall reco