Bishops Palace House Thames Street Kingston Upon Thames KT1 1QN
Details required for Condition 9 (Nature Conservation Scheme) and partial discharge of Condition 22 (Tree Protection) of planning permission 22/03694/FUL (Change of use from nightclub (sui generis) in first floor to flexible restaurant (Class E(b))/office (Class E(g)(i)) drinking establishment (Sui Generis) with enhanced food provision (sui generis) and associated external terraces. Creation of flexible office (Class E(g)(i))/drinking establishment (sui generis) and associated external terraces in second floor including screening. Provision of new and reconfigured plant enclosures. Alterations to existing external staircase, installation of new lift rising to Level 1, extension to existing substation, elevational alterations to under croft and installation of new cycle parking, associated landscaping. Erection of first floor riverside extension to provide restaurant floorspace (Class E(b)), provision of external seating area, installation of new LED screen to show public artwork, new external cladding, cladding to external staircase at rear. Installation of new rooflights and photovoltaic panels in roof. Fenestration alteration.)
Warner Bros. Studios Leavesden Warner Drive Watford Hertfordshire WD25 7LP
Non material amendment to planning permission 22/0491/FUL: Internal and external amendments to Building 75, including alterations to the internal mezzanine, external window layout, and to the locations of the roller shutter access doors; The addition of Meet Me Room 2 (MMR2) in the northern corner of the central site; Minor internal footprint extension and façade alteration to the welfare/amenity Building 56 (to incorporate a Mezzanine level within the approved building footprint); The addition of a Waste Management Area adjacent to the sprinkler tanks on the southern edge of basecamp 1; Amendments to Buildings 73 & 74; Minor changes to the layout and positioning of the Sound Stages and associated offices (Buildings 52, 53, 58, 59, 60, 61, 62, 63, & 64), including the moving of the AHU facilities from the roofs of buildings 58 and 59, to adjacent at ground level, and the repositioning of several of the outbuildings; Addition of a small transformer station between buildings 63 and 64; Amendments to the layout of the internal (non-adopted) roads and foot/cycleways across the site; Amendments to Island Site road layout, including changes to roundabout to retain tree T37 and inclusion of a 1.8m high acoustic fence on the south-eastern boundary; and Various associated site wide landscaping amendments.
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Howards Farm Stockers Lane Kingfield Woking Surrey GU22 9DB
Approval of details pursuant to conditions 03 (External materials), 05 (Landscape details) and 06 (Tree protection details) of planning permission ref: PLAN/2020/1098 dated 20.04.2021 (Section 73 application to vary Conditions 2 and 5 of planning permission PLAN/2018/0823 (Proposed single storey detached outbuilding to form office, gym and playroom) to allow changes to the fenestration).
Low Snape Farm Walton Head Lane Kirkby Overblow North Yorkshire HG3 1HZ
Approval of details under condition 3 (Root Protection Area) and condition 5 (Tree Root Retention) of planning permission 21/01884/FUL: Erection of energy building with swimming pool, gym and store and solar PV panels, erection of glazed link extension, conversion of stables and outbuildings to form gallery, store, office, and annex including erection of single storey extensions, installation of windows, doors, rooflight and gates and associated groundworks and landscaping.
Plot H11A Within Land Bound By New Kent Road To The North Rodney Place To The East Plot H11B And Elephant Park To The South And Plot H5 To The West
Non-material amendments to reserved matters approval ref. 19/AP/2116 dated 15/1/2020 (approval of reserved matters (appearance, layout and scale only) for Plot H11A within Elephant Park submitted pursuant to the outline planning permission ref. 12/AP/1092. The proposal comprises the construction of three buildings ranging between 10 and 19 storeys in height (maximum height 66.8m AOD) comprising 222 residential units, 1,421.8 sqm (GEA) flexible retail, office, community and leisure (A1-A5/B1/D1/D2) uses, wheelchair accessible parking, cycle storage, servicing, plant areas, landscaping, new public realm, and other associated works, with a revised facade design, a revised ground floor layout, revised floorspace figures and a reduction in maximum height to those approved by reserved matters approval ref. 18/AP/1862 for Plot H11a). The proposed changes are to: Building C (tower) to change from a glazed balustrade to metal at level 18 and podium, the level 18 curtain wall and crown, and the PPC banding depth to all levels; to Buildings A and B mansion blocks their parapet design, window size reducation and pre-cast banding depth to all levels; and curtain wall configuation (including increasing the depth of louvres) across the plot.
West And Foster 2 Broomgrove Road Sheffield S10 2LR
Change of use from office to dwellinghouse, demolition of porch, erection of a two-storey side/front extension to form an annex, new front porch, provision of new roof with front and rear dormer windows, new boundary walls, entrance gates with stone pillars, removal of trees and landscaping works
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 4th March 2020 (RN 19/06767/FULL) which permitted variations to conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) : Namely to amend the description of development to read as follows: Variation of conditions 1 and 24 of planning permission dated 27 March 2019 (RN: 16/11376/FULL) for the: Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works.(Linked application 16/11377/LBC) AND; amendments including internal reconfigurations to 30 Gloucester Place and changes to approved plant layout, amendments to the ground floor retail shopfronts on the 19-35 Baker Street building; internal reconfigurations to 88-110 George Street resulting in a re-distribution of the residential mix, a change to the residential entrances, amendments to rooftop plant and green roofs, replacement of glazed windows with blind windows on the north, east and west elevations, and amendments to courtyard landscaping and green roofs of courtyard buildings.
Peabody Estate St Johns Hill London SW11 1TY
Details Landscape General Arrangement plan, Tree Planting Plan, Hard Landscape, Plan, Walls& Boundaries Plan, Soft Landscape Schedule and Landscape Specifications pursuant to conditions 3 and 13 of planning permission dated 15/01/2019 ref 2017/5837 (Variation of condition 15 (in accordance with approved drawings) pursuant to planning permission dated 18/10/2012 ref 2012/1258 (Demolition of all existing buildings. Erection of 5 buildings of 4-12, 4-8, 7, 5-7 and 4-6 storeys to provide 527 residential units (135 x 1 bed, 261 x 2 bed,105 x 3 bed and 26 x 4 bed), with approx. 7800 square metres of private, communal & public space & public routes. Car parking (121 spaces within basement and 15 spaces at grade), 687 cycle parking spaces plus approximately 530 square metres of community space in the centre of the site and approximately 569 square metres of commercial space (classes A1-A5 (retail, financial and professional services, cafe/restaurant, take away, pub/bar and/or B1 office use) at the northern end of the site. Vehicular accesses from Comyn Rd and Eckstein Rd and emergency access from St John's Hill and Strath Terrace.) to allow: Plot 2: two storey increase allowing an additional 23 flats and change in tenure to older persons social rent only, removal of basement carparking; Planning Portal Re: PP-08149002 Plot 3: two storey increase to the centre tower allowing an additional 11 flats and change in tenure to private rent only; Plot 6: one storey increase allowing three additional flats; Plot 7: four additional flats (through internal reconfigurations); Plot 8: loss of one flat; Plot 9: One storey increase to the western section, extension of southern section facing Comyn Rd to close the building gap and removal of corner feature to Comyn Rd to allow 31 additional flats, inclusion of parking below podium level; General alterations to fenestration and finishes to accommodate changes and reconfiguration of carparking resulting in a loss of 28 spaces. Overall reco